Review Date Reviewer's Name Type of Review Description Status Comments
05/19/2021 AWARNER1 LANDSCAPE REVIEW Completed CDRC TRANSMITTAL

TO: Planning and Development Services Department, Plans Coordination
FROM: Anne Warner, RLA
PDSD Landscape/NPPO Review
PROJECT: Warehouse Facility
T21PRE0116

TRANSMITTAL DATE: May 19, 2021


UDC Article 7.6 Landscaping and Screening
The Unified Development Code (UDC) requires all new development or an expansion of greater than 25% of an existing development submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4. and Administrative Manual 2-10.


UDC Article 7.7. Native Plant Preservation
An approved Native Plant Preservation Plan Sections 7.7.4 is required or a request for an exception from the Native Plant Preservation requirements in accordance with Sections 7.7.3.D.3 & .4 of the Unified Development Code (UDC) is required prior to Grading Plan approval.


UDC Technical Standards Manual – Section 4-01.0.0. Commercial Rainwater Harvesting and Section 5-01.0.0 Landscaping and Screening


If you have any questions about this transmittal, Contact Anne Warner at (520) 837-4969 or by email anne.warner@tucsonaz.gov
05/19/2021 MROSS2 COT NON-DSD FIRE Completed 1. Automatic sprinkler system will be required.
2. Fire alarm system will be required.
3. CO2 system must comply with IFC chapter 53
4. Fire apparatus access roads shall be asphalt or concrete, capable of supporting apparatus up to 75,000 pounds.


Michael Ross
520-837-7082
Michael.Ross2@tucsonaz.gov
05/21/2021 LOREN MAKUS ENGINEERING REVIEW Completed T21PRE0116 -
1. Site is in a balanced basin. Balanced basin detention and 5-year threshold retention is required.
2. Development plans submitted after June 1 must meet the standards in the newly adopted retention/detention manual: https://www.tucsonaz.gov/pdsd/codes-plans
3. Maximize water harvesting.
05/25/2021 JVWINKL1 COT NON-DSD TRAFFIC Completed T21PRE0116

1) New access off S Old Vail Rd will need to meet City of Tucson Access Management Guidelines for width and radius. New curb access ramps on either side according to PAG 207
2) Any out of compliance sidewalk along projects frontage on S Old Vail Rd will need to be replaced according to PAG 203
3) Please provide an estimate of the anticipated trip generation
4) Plans will need to show that the turning movements of the largest expected vehicles can enter off of S Old Vail Road and not impact adjacent travel lanes

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
05/26/2021 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Completed 150 - 210 pm - T21PRE0116 - Parcel 141-11-026A - Site Lot 3, Sunbelt Industrial Center

1. Tucson Water has no objections to the proposed development.

2. An existing 12" cement asbestos water main stub constructed under PN 026-1986 extends onto this property from the existing 16" water transmission line in S. Old Vail Rd.

3. The proposed fire loop shown on the detail drawing will need to be public water mains, and be reviewed and approved in Tucson Water's Master Water Plan and Design Plan processes. Eight (8) inch fire hydrants will be required.

4. Any questions, comments or concerns about these comments may be directed to:
Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
310 W. Alameda St.
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
05/27/2021 SAMUEL ROGERS ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Samuel Rogers, Planner

PROJECT: Thursday Pre-submittal meeting – T21PRE0116
Address: N/A
Parcel(s): 141-11-026A and 141-11-026B
Zoning: I-1/I-2
Existing Use: Vacant
Proposed Use: Marijuana Dispensary Off-site Cultivation Location

TRANSMITTAL DATE:

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. An address will need to be assigned by Pima County Addressing before a permit can be started.
3. Per the application this development includes two parcels, these parcels must be combined. Provide proof that a lot combo application had been accepted by the county during the Development Package (DP) process.
4. The proposed use is Marijuana Dispensary Off-site Cultivation Location and is subject to Use Specific Standards 4.9.9.E.4 and 4.9.13.Q.
5. In the P-I, I-1 and I-2 zones, there is no size limit.
6. In the I-1 and I-2 zones, a marijuana dispensary off-site cultivation location, or a marijuana dispensary off-site manufacturing location in the P-1, I-1, and I-2 zones, shall be located in a permanent, enclosed, locked facility in accordance with state statutes and Arizona Department of Health Services rules and shall not be located in a trailer, cargo container, mobile or modular unit, mobile home, recreational vehicle, or other motor vehicle.
7. In the I-1 and I-2 zones, a marijuana dispensary off-site cultivation location, or a marijuana dispensary off-site manufacturing location in the P-1, I-1, and I-2 zones, shall be setback a minimum of 500 feet from a K-12 public, private, or charter school, measured in a straight and direct horizontal line from the closest exterior or applicable interior suite wall of the marijuana off-site cultivation location to the closest property line of a school.
8. A marijuana off-site cultivation location or a marijuana dispensary off-site manufacturing location and associated uses such as infusion kitchens, shall comply with all lawful, applicable health regulations, including those promulgated by the Arizona Department of Health Services and any other authorized regulatory agency.
9. A marijuana dispensary off-site cultivation location or marijuana dispensary off-site manufacturing location shall provide only wholesale products to other marijuana dispensaries, marijuana dispensary off-site manufacturing locations, or marijuana dispensary off-site cultivation locations.
10. An odor mitigation plan shall be submitted demonstrating compliance with odor control requirements.
11. This site has split I-1 and I-2 zoning. Per Table 6.3-5.B: Exceptions To The P-I, I-1, & I-2 Dimensional Standards in the I-2 zone Medical Marijuana Dispensary Off-Site Cultivation Location have a max height of 75' and a minimum setback of 1½(H) to residential zones. (This exception to the Dimensional Standards brings requirements in line with the I-1 zone).
12. Parking is required at 1 space per 2,000 sq. ft. of storage area for the first 20,000 sq. ft. of storage area plus 1 space per 10,000 sq. ft. of storage area for over 20,000 sq. ft. of storage area, with a minimum of 2 spaces.
13. Land Use Classes which by their nature will not be used for public pedestrian access, such as industrial uses, commercial storage uses, wholesale uses, contractor yards, or similar uses, are not required to have sidewalks constructed, provided adequate pedestrian refuge areas are provided. Pedestrian circulation will still be required.
14. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at Samuel.Rogers@tucsonaz.gov or (520) 837-6932.