Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION LABELS
Plan Number - T21PRE0063
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/16/2021 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements. |
03/16/2021 | JPEELDA1 | COT NON-DSD | FIRE | Completed | 1) Roadway cross section should adhere to The Saguaro Trails Pad pages 95-98. 2) Designs should conform to the overal Saguaro Trails PIA John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov |
03/16/2021 | JPEELDA1 | COT NON-DSD | FIRE | Completed | Appendix D of the 2018 IFC D107.1 One or two family dweling resedintial developments. Developments of one or two family dwelings where the number of dweling units exceeds 30 shall be provided with two separate and approved fire apparatus access roads. Exception: Where there are more than 30 dwelling units on a signle public or private fire apparatus access road and all dwelling units are equipped with an approved fire sprinkler system. If you have any questions please call or email me: Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 |
03/31/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Completed | T21PRE0063 1. Drainage must be in conformance with the PAD requirements. |
04/01/2021 | JVWINKL1 | COT NON-DSD | TRAFFIC | Completed | 1) Roadway cross section should adhere to The Saguaro Trails Pad pages 95-98. 2) Designs should conform to the overal Saguaro Trails PIA John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov |
04/01/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Reqs Change | T21PRE0063 - 10090 E DREXEL RD - GradingPlat Saguaro Trails, Block 3 1. A water master plan for this project will need to be submitted to Tucson Water's New Development section for review and approval. 2. During the master water planning of this project, please plan on looping the on-site water mains to two different points in Tucson Water's existing water distribution system as required by Section 8-06.4.2.A of Tucson Water's Design Manual to meet water quality and fire flow requirements, or explaining what legal and/or technical reasons prevent such looping. 3. The new water lines will need to be located within public or private streets to the maximum extent practicable. Where this is not practicable, the new water lines will need to be centered within water line easements that lie on smallest number of private lands possible, and are a minimum of 15' wide. 4. The Fire Department's fire flow requirements will also need to be shown on the water master plan. 5. Upon approval of the water master plan, a detailed water design plan for the new water linrd will need to be submitted to Tucson Water's New Development section for review and approval. 6. The owner of the property will need to enter into a Construction Agreement with Tucson Water regarding the new water main before water line construction may begin. 7. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 310 W. Alameda St. P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 |
04/01/2021 | SAMUEL ROGERS | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Samuel Rogers, Planner PROJECT: Thursday Pre-submittal meeting - T21PRE0063 Address: 10090 E Drexel Road Parcel(s): 141-02-020B Zoning: PAD-30 Existing Use: Vacant Proposed Use: Residential Subdivision TRANSMITTAL DATE: 04/01/2021 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package (Tentative Plat and Site Plans). 2. The proposed width of the street appears to be around 25'. If guest parking is proposed on the street 8' will be required for the width of the on-street parking space. 3. A sidewalk must be provided with a 5' width and connect to adjacent ROW. 4. You will need to submit a tentative plat and final plat, the tentative must be issued prior to the approval of the final plat. All final plats must go to Mayor and Council on the consent agenda. 5. Section III.G of PAD-30 details the design variation requirements for residential units within this PAD. When you submit for your building permits, you will need to submit an accompanying sealed letter certifying conformance with the PAD. 6. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at Samuel.Rogers@tucsonaz.gov |