Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T21PRE0056
Parcel: Unknown

Address:
3450 N STONE AV

Review Status: Completed

Review Details: PREAPPLICATION LABELS

Plan Number - T21PRE0056
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/09/2021 ANDREW CONNOR LANDSCAPE REVIEW Completed . MAJOR STREET AND ROUTES SETBACK ZONE (MS&R)

5.4.2. APPLICABILITY

The MS&R standards apply to the following uses on property, any portion of which abuts or is adjacent to a street designated on the City’s or County’s MS&R Plan:

A. New structures;

B. Changes of use, including new structures occurring on vacant land;

C. Uses of land or structures legally existing as of June 27, 1988, that are expanded in floor area, lot coverage, parking, seating capacity, or any other expansion of use, as listed below. Exception. An expansion of off-street parking for a nonconforming existing use that increases the number of spaces to the minimum required by the UDC for that use is exempt from counting toward the 25% expansion: (See Figure 5.4-A.)

1. If the expansion is less than 25%, the MS&R applies to the proposed expansion. The remainder of the use or structure shall be governed by provisions in force at the time of initial approval for the use or structure;

2. If the expansion is 25% or more, the MS&R applies to the proposed expansion and to the parking and landscaping standards that apply to the overall development; or,

3. Expansions that occur after the effective date of the MS&R shall be cumulated in determining the 25% expansion.

If applicable: Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements.
03/11/2021 MROSS2 COT NON-DSD FIRE Completed An automatic fire sprinkler system will be required in the new building.
A fire alarm system is required for monitoring the sprinkler system.


Michael Ross
520-837-7082
Michael.Ross2@tucsonaz.gov
03/15/2021 ZELIN CANCHOLA COT NON-DSD TRAFFIC Completed No adverse comments. Standard requirements will apply.
03/18/2021 NMARTEL1 ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review
FROM: Nicholas Martell, Planner
PROJECT: Thursday Pre-submittal meeting - T21PRE0056
Address: 3450 N Stone Ave; Parcel: 10603026A, 10603032A
Zoning: R-3
Existing Use: Multifamily Development
Proposed Use: Multifamily Development
TRANSMITTAL DATE: March 18, 2021

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. The applicant is proposing an additional apartment building to an existing complex. Multi-family residential is permitted in the R-3 zone at 36 units per acre. There are 94 units in total proposed.
3. The proposal to demolish the structures must be approved by the Historic Preservation section, as they appear to be greater than 50 years old.
4. More information is needed to determine the use of the lot to the east. A lot combination may need to be approved before the DP can be approved.
5. Parking will be calculated at 1.25 spaces per dwelling unit. More information is needed to determine adequate parking, as the addition of the new building eliminates several spots. Ensure accessible parking standards are met.
6. Major Streets and Routes setbacks will be required for Yavapai Rd.
7. More information is needed to determine whether this will be a 25% expansion. If so, full code compliance will be necessary.
8. Ensure access standards found in section 7.8 of the UDC and sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual are met. Ensure pedestrian circulation standards are met.
9. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions about this transmittal, contact me at Nicholas.Martell@tucsonaz.gov
03/18/2021 LOREN MAKUS ENGINEERING REVIEW Completed T21PRE0056
1. Site is not in a flood hazard area.
2. Site is not in a balanced or critical basin.
3. Water harvesting must be maximized.
4. Provide waste stream calculation. (45 gallons per unit capacity in addition to calculation from 8-01)
5. Show solid waste storage and collection location.
03/23/2021 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Needs Review