Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION LABELS
Plan Number - T21PRE0050
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/01/2021 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | No comments at this time. |
03/08/2021 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | No adverse comments |
03/08/2021 | MROSS2 | COT NON-DSD | FIRE | Completed | None |
03/11/2021 | LSHAMIS1 | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Loran Shamis; Planner PROJECT: Thursday Pre-submittal meeting – T21PRE0050 Address: 990 E Valencia Rd Parcel(s): 14043011A Zoning: I-1 Proposed Use: Distribution System TRANSMITTAL DATE: March 11, 2021 COMMENTS: Development must comply with the Administrative Manual Section 2-06 - Development Package. The proposed use is Distribution System is permitted in the I-1 zone with use specific standards 4.9.11.A.1, .2, & .4 and 4.9.13.Q. Demonstrate compliance with UDC, Section 7.4.4 parking requirements – 1 space per 500 GFA with a minimum of 2 spaces per facility. Demonstrate compliance with parking space design per UDC, Section 7.4.6.D. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at loran.shamis@tucsonaz.gov or (520) 837-2242. |
03/11/2021 | SBLOOD1 | ENGINEERING | REVIEW | Completed | No comments Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
03/16/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Needs Review |