Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION LABELS
Plan Number - T21PRE0047
Review Name: PREAPPLICATION LABELS
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/23/2021 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | Show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-10.0.0, Landscape Plan Requirements. |
| 03/02/2021 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | No adverse comments, standard requirements will apply. Close any unused driveways Alley purchase will require Real Estate process. |
| 03/02/2021 | MROSS2 | COT NON-DSD | FIRE | Reqs Change | Your plans state that the building is sprinklered. I can't find any records that show that the building in sprinklered. Sprinklers were not required when this became an A2 occupancy. Sprinklers will not be required unless there is a change of use or a significant alteration to the property. Any modification to the kitchen hood system will require a separate permit through the fire department. Michael Ross 520-837-7082 Michael.Ross2@tucsonaz.gov |
| 03/04/2021 | NMARTEL1 | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Nicholas Martell, Planner PROJECT: Thursday Pre-submittal meeting - T21PRE0047 Address: 1929 E Grant Rd. Parcel(s): 112062840 & 112062850 Zoning: C-1, O-3 Existing Use: Food Service-Restaurant Proposed Use: Food Service-Restaurant TRANSMITTAL DATE: March 04, 2021 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. Food Service is a permitted use in the C-1 zone; with use specific standards 4.9.13.0, 4.9.4.M.1 & 5. 3. Parking is required at 1 space per 100 sq. ft. GFA. Ensure any outdoor seating area is accounted for when calculating parking. 4. Contact city of Tucson real estate division for alley purchase. 5. If the applicant decides to expand the patio, be aware that MS&R setbacks apply to both streets. 6. Parking is not permitted in the O-3 zone. A rezoning would be required. An expansion of more than 25% will trigger full code compliance. See 9.2.2. for information regarding the expansion of a nonconforming use. 7. The applicant can explore parking reductions and off-site parking agreements. 8. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions about this transmittal, contact me at Nicholas.Martell@tucsonaz.gov |
| 03/04/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 1. No comments Any questions, comments or concerns about this project may be directed to: Fabien Elenes, Engineering Associate Tucson Water, New Development Section 310 W. Alameda St. P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2202 Fabien.Elenes@tucsonaz.gov |
| 03/04/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Completed |