Plan Review Detail
Review Status: Completed
Review Details: PREAPPLICATION LABELS
Plan Number - T21PRE0017
Review Name: PREAPPLICATION LABELS
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/26/2021 | ANDREW CONNOR | LANDSCAPE | REVIEW | Completed | No comments at this time. |
| 02/01/2021 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Completed | No adverse comments |
| 02/01/2021 | MROSS2 | COT NON-DSD | FIRE | Completed | None |
| 02/03/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Completed | 1. No comments. 2. Any questions, comments or concerns about this project may be directed to: Fabien Elenes, Engineering Associate Tucson Water, New Development Section 310 W. Alameda St. P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2202 Fabien.Elenes@tucsonaz.gov |
| 02/04/2021 | LSHAMIS1 | ZONING | REVIEW | Completed | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Loran Shamis; Planner PROJECT: Thursday Pre-submittal meeting – T21PRE0017 Proposed Use: Equipment Well TRANSMITTAL DATE: February 4, 2021 COMMENTS: Development must comply with the Administrative Manual Section 2-06 - Development Package. As this site is located in unincorporated Pima County, City of Tucson zoning standards do not apply. A Special Exception procedure also does not apply in this case. A development package is still required to review other site development features, such as grading, floodplain, etc. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions please contact me at loran.shamis@tucsonaz.gov or (520) 837-2242. |
| 02/04/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Completed |