05/25/2022 GARY WITTWER DOT LANDSCAPE REVIEW Reqs Change DTM Landscaping Comments:

1. Please add an approved seed mix to the plan that will cover all areas disturbed by construction activities and not covered with hardscape. Seed mixes should correspond to the watershed. Consult Riparian Habitat Mitigation Guide for plants in this watershed.

2. Please install a 6" Sch 40 PVC sleeve at a 2.5 foot depth under the road at the Craycroft intersection that extend 2" beyond the driveways on each side within the ROW. Plug ends to prevent backfill dirt from entering pipe.


David Marhefka, PLA
da’-vid mär-hef’-ka
Landscape Architect Project Manager
City of Tucson
Department of Transportation and Mobility
(m) 520-403-5074
05/25/2022 RLEIGH1 UTILITY CLEARANCES COT STREETS DIVISION Completed
05/25/2022 ZELIN CANCHOLA DOT TRAFFIC REVIEW Reqs Change DTM review comments

Comments for the Garden Stone Drive PIA, which I note ties into the improvements that will
be constructed as part of the Blackhawk Ranch Phase 1 PIA:
- Sheet 2: Why is design speed 45 mph (10 mph over posted speed) instead of 40 mph?
- Sheet 3: I recommend that the typical secon is revised to 11 foot travel lanes and 7 foot bu?ered bike
lanes (5+2) (WS4 stripe o?set 2' from WS6 travel way edge stripe). Same comment made on Blackhawk
PIA where this road es in
- Sheet 8: From Sta 14+61 on, the plan shows a broken yellow centerline, which would indicated
motorists can make passing movements on this 35 mph roadway that includes horizontal curves.
Recommend that the YDS4 striping be used the length of the project to prohibit passing movements and
encourage motorist traveling speeds to stay low
Thank you,
Greg
05/25/2022 RICHARD LEIGH PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSSADOR Completed
05/25/2022 JIM FEMLING DOT STREET MAINTENANCE REVIEW Approved
05/25/2022 ERNIE ENCINAS DOT_ELEC REVIEW Completed
05/25/2022 RICHARD LEIGH DOT ENGINEERING REVIEW Reqs Change May 25, 2022

Richard Leigh, DTM Eng. Review

RESUBMITTAL REQUIRED: TDOT Permit Review Section has reviewed the subject PIA paving plan and does not recommend approval at this time. The following comments need to be addressed and plans revised prior to resubmittal. Please include a response letter addressing the following comments.


1. Add the plan number “I-2021-013” in the title block of each sheet.

2. Add PIA activity number “T21PI00015” on coversheet.

3. Sheet 2: Revise General Paving Note 3 to indicate that Asphaltic concrete will comply with PAG Replacement Specification for Section 406 Asphaltic Concrete, Updated Sequence No. 2019-2.

4. Sheet 3: Provide erosion protection calculations for at-grade dip crossings.

5. Sheet 3 Thru 6: Revise cross sections for at-grade dip crossings to provide a minimum 4% cross section to reduce deposition of sediment. Reference Sec. 11.6 of the SMDD&FM

6. Sheet 3: Revise Pavement section detail to indicate subgrade preparation recommendations indicated in the geotechnical for Garden Stone Drive.

7. Sheet 3: Indicate that an 8’ wide graded shoulder will be provided along the roadway.

8. Refer to redline drawings for additional comments and comment details.

If you have any questions, I can be reached at 520-237-8692 or emailed at Richard.Leigh@tucsonaz.gov.
05/25/2022 RICHARD LEIGH PIA COORDINATOR OUT TO CUSTOMER Completed
05/25/2022 RLEIGH1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Needs Review
05/25/2022 RLEIGH1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed
05/25/2022 RLEIGH1 UTILITY CLEARANCES QUEST COMMUNICATION Completed
05/25/2022 RLEIGH1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
05/25/2022 RLEIGH1 UTILITY CLEARANCES COX COMMUNICATION Completed
05/25/2022 RLEIGH1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
05/25/2022 RLEIGH1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed
05/25/2022 RLEIGH1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed