Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T21PI00015
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/16/2022 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Needs Review | Comments: 1. Please add an approved seed mix to the plan that will cover all areas disturbed by construction activities and not covered with hardscape. Seed mixes should correspond to the watershed. Consult Riparian Habitat Mitigation Guide for plants in this watershed. 2. Please install a 6" Sch 40 PVC sleeve at a 2.5 foot depth under the road at the Craycroft intersection that extend 2" beyond the driveways on each side within the ROW. Plug ends to prevent backfill dirt from entering pipe. |
05/16/2022 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
05/16/2022 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Needs Review | - Sheet 2: Why is design speed 45 mph (10 mph over posted speed) instead of 40 mph? - Sheet 3: I recommend that the typical section is revised to 11 foot travel lanes and 7 foot buffered bike lanes (5+2) (WS4 stripe offset 2' from WS6 travel way edge stripe). Same comment made on Blackhawk PIA where this road ties in - Sheet 8: From Sta 14+61 on, the plan shows a broken yellow centerline, which would indicated motorists can make passing movements on this 35 mph roadway that includes horizontal curves. Recommend that the YDS4 striping be used the length of the project to prohibit passing movements and encourage motorist traveling speeds to stay low Thank you, Greg |
05/16/2022 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
05/16/2022 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Needs Review | |
05/16/2022 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Needs Review | |
05/16/2022 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Needs Review | |
05/16/2022 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
05/16/2022 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | |
05/16/2022 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | |
05/16/2022 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | |
05/16/2022 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | |
05/16/2022 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | |
05/16/2022 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | |
05/16/2022 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | |
05/16/2022 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review |