Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T21PI00013
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/15/2021 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
11/15/2021 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | |
11/15/2021 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Reqs Change | Here are my comments on the Bella Tierra Phase 3 plans: 1- Sheet 9, on Irvington Rd, why is 6' sidewalk proposed to be constructed out of AC instead of concrete? Concrete likely to have longer service life 2- Sheet 12, on Wingate Blvd, with 47 feet of pavement, recommend that typical section be revised to include 7 foot bike lane (5 feet + 2 foot buffer space), 11 foot travel lane, 11 foot TWLTL, 11 foot travel lane, and 7 foot bike lane (5 feet + 2 foot buffer space). WS6 stripe is travel lane edge stripe, WS4 is 2 feet offset for buffer space, leaving 5 foot bike area 3- Sheet 12, near Sta 81 and 82, please remove left turn arrows from plan. City does not typically place arrows or legends in single left turn lanes for maintenance reasons 4- Sheet 12, also for left turn lane, western stripe for SB left turn lane should be WS8, not YDS4 5- Sheet 12, do we need Bike Lane Ends signage for SB direction? Thank you, Greg Orsini, P.E. Gregory.Orsini@tucsonaz.gov |
11/15/2021 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Approved | |
11/15/2021 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
11/15/2021 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | |
11/15/2021 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | |
11/15/2021 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | |
11/15/2021 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | |
11/15/2021 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | |
11/15/2021 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | |
11/15/2021 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | |
11/15/2021 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review | |
11/18/2021 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | Refer to redline drawings for comments. |
11/18/2021 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
11/18/2021 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |