Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T21PI00012
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/27/2021 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
10/27/2021 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Needs Review | |
10/27/2021 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | |
10/27/2021 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
10/27/2021 | JIM FEMLING | DOT STREET MAINTENANCE | REVIEW | Approved | |
10/27/2021 | ERNIE ENCINAS | DOT_ELEC | REVIEW | Approved | |
10/27/2021 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | John Van Winkle, P.E. Engineering Manager Department of Transportation and Mobility C (520) 429-6116 1) Recordation information must be noted on the cover sheet. Plat must be recorded before submittal of mylars for final approval 2) Add the following “All Drainage Infrastructure, indicated on the plans, is in accordance with the Drainage Report approved by the Planning and Development Services Department” 3) Removed duplicated note 20 on sheet 2, which is shown on note 6 on sheet 1 4) Add the following note “The City shall not be held liable for any errors and/or omissions on these plans. Items not meeting City Standards shall be repaired/replaced at no cost to the City” 5) Add the following note “The Engineer of Record shall submit to the City for review any changes to the approved plans prior to construction. Additionally, the Engineer of Record shall certify all changes meeting all applicable standards, codes, and ordinances. 6) Add the following note “Floodplain Use Permit No,______ has been issued by Planning and Development Services Department for work impacting City and FEMA Floodplains. 7) Sheets 3-4 indicate which roadway cross section is being provided, A or B shown on sheet 7. 8) Sheets 3 and 4, keynote 6, references detail E6. This should be detail E7? 9) Add T21PI00012 to plans as needed 10) Add Plan number I-2021-012 to all sheets. |
10/27/2021 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
10/27/2021 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Needs Review | |
10/27/2021 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Needs Review | |
10/27/2021 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Needs Review | |
10/27/2021 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Needs Review | |
10/27/2021 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Needs Review | |
10/27/2021 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Needs Review | |
10/27/2021 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Needs Review | |
10/27/2021 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Needs Review |