Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T21PI00006
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/20/2021 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approved | |
07/20/2021 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
07/20/2021 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
07/20/2021 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
07/20/2021 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
07/20/2021 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
07/20/2021 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
07/20/2021 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
07/20/2021 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
07/20/2021 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
08/04/2021 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | 1. Provide a manhole at the stormdrain angle point at +/- Sta. 12+37 (Drainage Pipe). Refer to COT SMDD&FM Sec. 10.9.1.8 2. Indicate that the grouted rip rap slope treatment will be applied along the entire slope of the roadway embankment at the pipe culvert inlets and outlets. 3. Provide barricade railing along the slopes with a slope greater than 4:1 adjacent to the roadway, specifically at the drainage culvert crossings. 4. heet 11: Revise Sidewalk Scupper detail to reference platted street names. Richard Leigh Richard.leigh@tucsonaz.gov |
08/04/2021 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
08/04/2021 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed |