Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA - SUBMITTAL
Plan Number - T21PI00002
Review Name: PIA - SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/05/2021 | ZELIN CANCHOLA | DOT TRAFFIC | REVIEW | Approv-Cond | Reviewer: Greg Orsini, P.E. 1- Sheet 11 needs to change reference from PM Manual Sht 2-9 & 2-10 to Signing & Marking manual Sht 3.2.4 - just like they corrected on Sheet 9 2 - Sheet 9, WG6 (2x6) callout should end at Sta 18+25, not 16+25; and then WS6(2x6) should simply be WS6 - the solid stripe |
04/05/2021 | RICHARD LEIGH | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSSADOR | Completed | |
04/05/2021 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Reqs Change | Previous comments: 1. Sheet 7: Provide complete details for the proposed channel and culvert within the Alvernon Way right-of-way. Include headwall, erosion protection, slope protection, barricade railing. 2. A flowage easement will be required for the portion of culvert and channel located on private property. refer to COT Standards Manual for Drainage and Flooplain management Sec. 1.5. 2. Sheet 13: Correct lane labels in section A/13. 3. Sheet 13: Revise sidewalk width to 6’ in section C/13. |
04/05/2021 | RICHARD LEIGH | PIA COORDINATOR | OUT TO CUSTOMER | Completed | |
04/05/2021 | RLEIGH1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
04/05/2021 | RLEIGH1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
04/05/2021 | RLEIGH1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
04/05/2021 | RLEIGH1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
04/05/2021 | RLEIGH1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
04/05/2021 | RLEIGH1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
04/05/2021 | RLEIGH1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
04/05/2021 | RLEIGH1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
04/05/2021 | RLEIGH1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
04/21/2021 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approv-Cond | - Sheet 11 needs to change reference from PM Manual Sht 2-9 & 2-10 to Signing & Marking manual Sht 3.2.4 - just like they corrected on Sheet 9 - Sheet 9, WG6 (2x6) callout should end at Sta 18+25, not 16+25; and then WS6(2x6) should simply be WS6 - the solid stripe |