Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T21CM09907
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/23/2022 | JPEELDA1 | FIRE | REVIEW | Approved | |
03/23/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM09907 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. The Geotechnical Report submitted in response to the corrections of Cycle 1 references International Building Code 2006 under Seismicity on page 9 of the report. Investigate and verify if any changes to be made based in IBC 2018 for the Building and submit response with seal and signatures of the Engineer of Record. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Approved 1 All violations complied 2.Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E1.0 BASEMENT LIGHTING PLAN: Should have/add exit signs directly over exit doors ie stairway doors. Comment applies to other sheets. E1.1 1ST FLOOR LIGHTING PLAN: South Stairwell should have Exit signs. E2.1 1ST FLOOR POWER PLAN: Circuits for CP-1 not fully identified. E2.3 3RD FLOOR POWER PLAN: Suggest some Service receptacles on this level PLUMBING REVIEW COMMENTS: Denied Second Review: 1). OK 2). OK 3). SAME- Updated Plan Pg. T1.0 Total occupant load is (368) Business 105 & S1 263, B occupnacy 1 per 25 for toilets & 1 per 40 for lavs. S1 is 1 per 100 for toilets & lavs.... Toilet & lav count is still doesn't meet minimum requirement. -IPC 403.1 update all affected floor plan & plumbing pages. Also fixture count formula on T1.0 is incorrect per IBC 2902.1 & IPC 403.1 4). SAME Pending comment #3, Add toilet & Lav sidewall wall to fixture center measurements to plan pg A2.1. -IPC 404.2 405.3.1 5). SAME- Add seismic straps to water heater detail on plan page P3.0. -IPC 502.4 (seismic detail that was added was for expansion tank only) 6). OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
03/25/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
05/02/2022 | SBLOOD1 | ENGINEERING | REVIEW | Approved |