Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - TI ALL
Permit Number - T21CM09845
Review Name: RESUBMITTAL - TI ALL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/10/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM09845 2830 E Median Rd – I-1 Covered Parking Structure (2nd Review) TRANSMITTAL: June 10, 2022 This site is located in the I-1 zone (UDC 4.7.29). General Manufacturing is an allowed use in the zone (UDC Table 4.8-5), subject to Use Specific Standards 4.9.5.C.2, .6, .7, & .8 and 4.9.13.Q . 1. Zoning has reviewed the building plans for compliance with DP20-0173 and although it appears that the plans match until the DP is approved by all review agencies Zoning cannot approve this building permit. If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov. |
06/10/2022 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
06/16/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Approv-Cond | Activity Number: T21CM09845 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved 1.Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Approved If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
06/23/2022 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | The civil utility drawings were not included in the most recent submittal. Do not include them as "supplemental information", the construction of the site utilities shall be an integral part of the building shell construction. [Initial comment: An approved development plan is not to be used for construction or modification of on-site utilities (e.g. water service to buildings, building sewers, site lighting, electrical service to buildings, etc.). Provide the civil utility drawings that show the location of the proposed water meter, backflow preventer, and the water service pipe on a site plan. Provide the size of the water meter serving this building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1 and 107.2.6, IBC 2018.] |
06/29/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Passed | |
07/06/2022 | KROBLES1 | ENGINEERING | REVIEW | Needs Review |