Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T21CM09842
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/12/2022 | LSHAMIS1 | ZONING | REVIEW | Approved | |
| 01/12/2022 | LSHAMIS1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 01/14/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 01/20/2022 | NROSS1 | WATER | REVIEW | Passed | |
| 01/20/2022 | SBLOOD1 | ENGINEERING | REVIEW | Passed | |
| 01/25/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM09842 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. The Structural Calculations submitted shows that the Floor Deck is inadequate to support the proposed added loading and need reinforcing. The Architectural Drawings submitted does not show any reinforcing to the Floor Deck. Revise Drawings and resubmit. No Structural Drawing submitted with this submittal. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Approval Pending 1. Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS Approval Pending E1.1: Cannot read Keynote #1, should correct before issuing for construction. E6.0: Should call out conductor material for feeders to panels AB and AA-1 PLUMBING REVIEW COMMENTS: Denied 1). plan Page M1.2 needs to show the condensate drain routing to the termination point for the new equipment. -IPC Section 314 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/25/2022 | VVERA1 | OUT TO CUSTOMER | Completed |