Permit Number: T21CM09821
Parcel: Unknown

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T21CM09821
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2022 JVINCEN1 FIRE REVIEW Reqs Change -Indicate the total cubic feet of tire bulk storage areas.
-Indicate the height of storage
-Occupant load chart on sheet A001 lists "storage/warehouse" as 7498sqft. This area on the floor plan is labeled as "service." The plans indicate this area will be used to service commercial motor vehicles. Clarify the use of the area and the gross vehicle weights of the vehicles being serviced.
-Per IFC 903.2.9.1 #4. A Group S-1 fire area for the repair of commercial motor vehicles where the fire area exceeds 5000 sqft.

-Note for reviewers: Fire alarm sheets included with this submittal will not be reviewed during this review. Deferred submittal to TFD.
01/13/2022 ROBERT SHERRY WATER REVIEW Reqs Change 1. Show the location of the proposed water meter, backflow preventer, and the water service pipe on a site plan (i.e. include the civil utility plans in the building plan set). Provide the size of the water meter serving this building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1 and 107.2.6, IBC 2018.
2. Reduced pressure backflow prevention assemblies are required to be installed in locations accessible to Tucson Water. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf
01/19/2022 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T21CM09821
5570 E Travel Plaza Way - C-2
Tire Shop for Semi-Trucks (1st Review)

TRANSMITTAL: January 19, 2022
This site is located in the C-2 zone (UDC 4.7.21).

1. By definition, see UDC Article 11.3.4.W, the proposed use would be considered Trade Service and Repair: Major, not an allowed use in the C-2 Zone. A rezone of the property to C-3 zone will be required.

2. Once rezoned a commercial site plan, Development Package (DP), must be submitted and approved prior to approval of these building plans.

If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov.
01/19/2022 SSHIELD1 ENGINEERING REVIEW Reqs Change See Zoning comments
01/19/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
01/24/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM09821


GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Denied
1. Provide Structural Calculations for Foundations and Mezzanine per Section 1601.1 of International Building Code 2018. Provide Structural Calculations for the Building and the Column Reactions for the design of Proposed Footings. Provide Design and Sizes (Length, Width, Depth and Reinforcing) of the Proposed Footings.
2. Provide Wind Load Calculations for the Building per Section 1609 of International Building Code 2018.
3. Provide Seismic Calculations for the Building per Section 1613 of International Building Code 2018.
4. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018.
5. Areas used for storage are to include 25% of the live load in determining the effective seismic weight. Verify the additional load is applied to the mezzanine lateral resisting system as required in ASCE-7 Section 12.7.2.
6. The mezzanine is supporting equipment loads. Verify the total operating weight of permanent equipment is included in determining the effective seismic weight and applied to the lateral resisting system as required in ASCE-7 Section 12.7.2.
7. DEFERRED SUBMITTAL REQUIREMENTS
Structural general notes are to include any components of the building that may be considered deferred submittals. IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official.
If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1:
* To be reviewed by design professional in responsible charge.
* Design professional shall affix a notation that the deferred items are in general conformance with their design of the building.
* They shall be submitted for review by the building official.
* Shall not be installed until approved by building official.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings.


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Denied
1. Air intake openings shall not be located less than 10' horizontally from streets. alleys. parking lots and loading docks (IMC2015,401.1)


ELECTRICAL REVIEW COMMENTS
Approved


PLUMBING REVIEW COMMENTS:
Denied
1). Provide Civil plan for downspout continuation as stated on plan page A401. -IPC A106.3.1
2). Provide Civil plan for sewer & water service continuation as stated on plan page P101. -IPC A106.3.1
3). A & B service drains in #107 service area on plan page P101 & P103 need to discharge to the oil interceptor system. -IPC 1003.4
4). C drain 2" in shop warehouse #108 needs to discharge to the oil interceptor system same as the 3" C drain in the same area. on plan pages P101 & P103. -IPC 1003.4
5). The most upstream B 2" drain in service are #107 on plan pages P101 & P103 needs to have the base of it's vent needs washed. -IPC 905.3
6). Floor drains connected to the oil interceptor system need to be vented same as drains on the sanitary system. Update plan pages P101 & P103 -IPC 901.2.1
7). Sump pit on P101 needs to be vented. -IPC 712.3.2
8). Add Sump pit detail to Plan page P104. -IPC A106.3.1, 712.3
9). Sump pump discharge piping needs to comply with -IPC 712.3.3. Update plan pages P101 & P105
10). Water Heater location on plan pg. P102 isn't clear. -IPC A106.3.1
11). Oil interceptor needs to be vented -IPC 1003.9 Update plan pages P101 & P103
12). Add oil interceptor sizing calculations that derive from -IPC 1003.4.2.2 to plan page P105
13). Ice maker Water connection needs ASSE 1022 or 1024 backflow preventer. -IPC 608.17.1 Update plan pg. P105
14). Eyewash station on Plan pg. P105 needs ASSE 1071 mixing valve. -IPC 411.3
15). C drains on plan page P105 need traps & trap primers. -IPC 1002.1 & 1002.4.1
16). Add the gas piping sizing table used to plan pg. P103. -IFGC 402.4
17). Add gas pressure regulator manufacturer name & model number to plan pg. P105. -IFGC 410.1
18). Illustrate how the gas pressure regulators are to be vented on plan Pg. P102 -IFGC 410.3

Final Status

Task End Date Reviewer's Name Type of Review Description
01/24/2022 VVERA1 OUT TO CUSTOMER Completed