Permit Number: T21CM09809
Parcel: 13405119P

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T21CM09809
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2022 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM09809

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

BUILDING REVIEW COMMENTS:
Approved

MECHANICAL REVIEW COMMENTS:
Approval Pending
1. Approved/Subject to field approval

ELECTRICAL REVIEW COMMENTS
Approved

PLUMBING REVIEW COMMENTS:
Denied
1). The mop sink needs to connect to the grease system. -Tucson Amendment 1003.3
2).Provide the existing grease interceptor type & sizing calculations to show it is a gravity type not hydromechanical & sized to meet the demand of the buildout. - Tucson Amendment 1003.3
3). Ice machine #10 on P-1102 & P-1106 can't discharge to the grease system. -IPC 1003.2
4). The condensate on P-1102 needs to discharge indirectly to the sanitary system. update pipe routing & note #12. -IPC 802.1.5
5). Hot return line & pump needs to be illustrated on P-1105. -IPC A106.3.1
6). Hot system needs 1" insulation update P-1101 notes. -IPC 607.2.1 607.5
7). Each piece of Beverage equipment needs an individual ASSE 1022 or 1024 backflow on the water connection. -IPC 608.17.1
8). Add the type of piping materials to be used to P-1000 -IPC A106.3.1
01/06/2022 JVINCEN1 FIRE REVIEW Approved
01/13/2022 ROBERT SHERRY WATER REVIEW Completed
01/19/2022 STEVE SHIELDS ZONING REVIEW Approved
01/19/2022 SSHIELD1 ENGINEERING REVIEW Passed
01/19/2022 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
01/19/2022 VVERA1 OUT TO CUSTOMER Completed