Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T21CM09775
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/23/2022 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Civil utility plan and water demand not included in resubmittal. [Initial comment: Show the location of the proposed water meter, backflow preventer, and the water service pipe on a site plan (e.g. the civil utility plan). Provide the size of the water meter serving this building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. The development package is not a substitute for a complete site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018.] |
02/28/2022 | DBENOIT1 | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM09775 & T21CM09776 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Denied 1. The previous comments have not been addressed. Sheet G2.0: The code review indicates that should be an area calculation table and a building code summary table on this sheet, however, no tables exists. Provide the necessary tables. MECHANICAL REVIEW COMMENTS: Conditionally Approved 1. Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved PLUMBING REVIEW COMMENTS: Denied Second Review: 1). Provide civil site utility piping plan that is listed on CVR2.0 & addressed on P1.0, to show the continuation the water service & sewer. And to show the civil plan correlates with Building plans. -IPC A106.3.1 2). OK 3). OK 4). OK 5). OK 6). OK 7). SAME NOT ADDRESSED-Cold water connection for each evaporator cooler needs a backflow device. -IPC 608.3 |
03/11/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
03/11/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM09775 & T21CM09776 2730 E Drexel Rd – P-I/I-1 General Manufacturing (2nd Review) – DP21-0316 TRANSMITTAL: March 11, 2022 This site is located in the P-I/I-1 zones (UDC 4.7.28/4.7.29). General Manufacturing is a permitted use in this zone (Table 4.8-5) subject to Use Specific Standards P-1 4.9.5.C.2, .4, .5, .6, & .8 and 4.9.13.Q / I-1 4.9.5.C.2, .6, .7, & .8 and 4.9.13.Q. Provide a detail comment response letter with the next submittal. 1. Zoning has reviewed the building plans for compliance with DP21-0316 and it appears that the building plans match the DP but until the DP is approved Zoning cannot approve the building plans. 2. Any DP21-0316 sheets provided in the building plan set, with the exception of utility plans, either need to be the stamped approved DP sheets, marked as for reference only or removed from the building set. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
04/14/2022 | ARUIZ1 | ENGINEERING | REVIEW | Needs Review |