Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T21CM09672
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/18/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM09672 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/Subject to field approval ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Denied 1). OK-. The New restroom on Plan pages P1.1 & A1.0 can't open directly into the kitchen area -IPC 403.3.2 (PLAN PAGE A1.0 HAS BEEN UPDATED) 2). SAME-Due to the quantity & type of items required to connect to the grease system in this establishment a hydromechanical grease interceptor can't be used. Update plan pages P1.1 & P3.0. with a gravity type grease interceptor - Tucson Amendment IPC 1003.3 See Tuscon amendment below Hydromechanical grease interceptors. Hydromechanical grease interceptors (HGI), which are generally installed inside, may be used when there are four (4) or fewer fixtures. The minimum size HGI to be installed shall be rated no smaller than 25 gallon per minute with a 50 pound grease capacity. Flow Control devices shall be designed and installed so that the total flow through such devices shall at no time be greater than the rated flow. Exception: If a dishwasher or food waste disposal unit is used in the facility, an HGI (hydromechanical)cannot be used and an appropriately sized GGI (Gravity Grease Interceptor) or alternative pretreatment device, capable of accepting these wastes, must be installed. **Approval documentation as stated in response sheet needs to be uploaded with submittal 3). SAME-The K4 ice machine can't discharge to the grease system, Update P1.1 & P1.3 -IPC 1003.2**Approval documentation as stated in response needs to be uploaded with submittal 4). SAME PENDING SOLUTION TO COMMENT #2- . Add Grease interceptor sizing calculations to plan pg. P3.0 -IPC 1003.3.7 5 thru 8 OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
| 04/20/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
| 04/20/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 07/11/2022 | LOREN MAKUS | ENGINEERING | REVIEW | Approved |