Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM09555
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2022 | IMONSHI1 | ZONING | REVIEW | Approved | |
01/04/2022 | IMONSHI1 | ENGINEERING | REVIEW | Passed | |
01/04/2022 | IMONSHI1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
01/05/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Specify the air flow rate for the new restroom exhaust fans. Ventilation for restrooms in public spaces requires a minimum of 50 CFM of mechanical exhaust per water closet or urinal if the exhaust is continuous and 70 CFM if the exhaust is intermittent. Reference: footnote e, Table 403.3.1.1, IMC 2018. |
01/05/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, safety pan, and valves. Reference: Sections 503.1, 504, 606.1, 607.2, and 607.3, IPC 2018. 2. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. 3. The specified safety eyewash is a self-contained unit with a 7-gallon water storage tank and has no provision for a piped water connection. Why is water being piped to the unit? Reference: Section 107.2.1, IBC 2018. |
01/05/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
01/11/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
01/14/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
12/21/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved |