Permit Number - T21CM09526
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/14/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM09526, T21CM09527, T21CM09528 & T21CM09529 3732 E Pima St. – R-2 Multi-Family (2nd Review) TRANSMITTAL: March 14, 2022 This site is located in the C-2 zone (UDC 4.7.9). Multi-Family is a permitted use in the zone, (UDC TABLE 4.8-2) subject to Use Specific Standard 4.9.7.B.6, .9, & .10. 1. As the first review of DP21-0356 has not been completed Zoning will review the building plans on the next submittal for compliance with the DP. Zoning cannot approve the building plans until the DP is approved. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
| 03/30/2022 | DBENOIT1 | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM09526, T21CM09527, T21CM09528 & T21CM09529 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied The Structural Comments from Cycle 1 are not addressed. Address the following comments and resubmit. 1. The Structural Calculations Enercalc print outs references IBC2012 and ASCE7-10. Resubmit Calculations with currently adopted Codes of IBC2018 and ASCE7-16. 2. The Seismic parameters used in Structural Calculations submitted does not match with General Structural Notes sheet S1.0. Make revisions as needed. 3. Balcony guards are to be designed for the loads provided in IBC 2018 Section 1607.8.1. 4. Structural steel, components and fasteners which are exposed to weather are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings BUILDING REVIEW COMMENTS: Denied 1. Sheet A7.0: Wall Section 8A indicates a detail 1/A13.0, however, that detail cannot be located. Please provides this detail along with a typical wall schedule that indicate the UL assembly numbers. MECHANICAL REVIEW COMMENTS: Denied 1. Provide ceiling radiation damper (this applies to all apartment units on 1st floor (IMC2018,607.6.2). Response: None required, see note on plan “all supply ductwork is routed below roof trusses and above dropped ceiling. Not Complied your note says that all supply ductwork is routed below roof trusses and above dropped ceiling I am not talking about the 2nd floor, I'm talking about the first floor and 2nd floor separation 2. Provide shaft enclosure for dryer duct in an approved manner (This applies to all apartment units on the 1st. floors) (IMC2018,607.6.2) Response: Dryer duct installed below rated ceiling. Not Complied you are not clear on your mechanical plan how you are routing the dryer duct on the first floor. what you state in your response don't show on the mechanical plan 3. Where equipment and appliances are located 16’ above grade an interior or exterior permanent means of access shall be provided in and approved manner (IMC2018,306.5 Response: Refer to Architectural plans. See elevation sheets for roof access ladder locations. Complied 4. There shall be no ON/OFF switch to override continuous fan operation in bathroom at 25 cfm (IMC2018,403.3.1.1) Response: Provide 7-day programmable wall switch equal to Intermatic model ST700W or Equal time clock. Electrical Drawings E2.3 and E2.4 have been updated to reference this Mechanical change Complied 5. Provide 50 cfm of exhaust to bathrooms on you schedule you got minimum 35 maximum 100. It needs to state 50 so that it can be balanced to that (IMC2018,403.3.1.1) Response: Per IMC 403.1.1, 20 cfm continuous or 50 cfm intermittent Complied 6. Provide ceiling radiation damper (IMC2018,607.6.2). Response: Not required.. Not Complied all rated ceiling penetrations on the first floor shall be protected in an approved manner. further you have a detail on M2.1 shat shows you are penetrating the rated floor/ceiling assembly with a 4" outdoor air duct without approved protection, cant do that. 7. 6" range hood exhaust duct on 1st floor penetrating rated floor/ceiling assembly shall be protected in an approved manner and fire dampers cant be used (IMC2018,607.6.1) ELECTRICAL REVIEW COMMENTS Conditionally Approved Electrical sheet descriptions on Title Sheet TS.1 don't correlate with actual Electrical Sheet numbers of descriptions. PLUMBING REVIEW COMMENTS: Denied Second Plumbing Review: 1). SAME-Plan sets needs to include the missing site utility piping plans pages 1 thru 6 as shown on sheet index page TS1. -IPC A106.3.1 **SITE UTILITY PIPING PLAN PAGES NEEDED TO SHOW THAT THE SANITARY SEWERS,,WATER SERVICES, & STORM PIPING CORRELATE WITH THE PLUMBING PLAN BLDG. UTILITY CONNECTION LOCATIONS & SIZES** 2 THRU 6 OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
| 04/15/2022 | IMONSHI1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Reqs Change | |
| 04/29/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | The DP needs to be approved before the building permit is approved. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |