Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM09525
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
01/04/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
01/04/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. The use of a point-of-use water dispenser in lieu of a drinking fountain requires the installation of a listed and labeled dispenser along with a permanently mounted disposable cup dispenser. The cup dispenser shall be located adjacent to the water dispenser with the dispensing end between 34" and 48" above the finished floor. 2. Revise the project narrative to add a point-of-use water dispenser rather than a hi-lo drinking fountain. Reference: Section 107.2.1, IBC 2018. |
01/04/2022 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
01/04/2022 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
01/04/2022 | ROBERT SHERRY | WATER | REVIEW | Completed | |
01/11/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Passed | |
01/14/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
12/20/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet TS.1; Project Code Check: Per the IBC Section 304.1, the Occupancy Classification for this use (training and skill development not in a school) should be a B. Please indicate on this sheet. 2. Sheet TS.1; Project Code Check (Plumbing Calculations): Per the IBC Table for a B Occupancy Classification, water closets required are one per 25 for the first 50 for men and women. This would require two water closets for males and two water closets for females. In addition, lavatories required are one per 40 for the first 80 for men and women. This would require two lavatories for males and two lavatories for females. Please revise the Plumbing Calculations on this sheet, and revise the Floor Plan on Sheet A.1. 3. General: Please provide a new valuation for this project as required. 4. General: Please provide written responses to all review comments. |