Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM09362
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
01/14/2022 | JVINCEN1 | FIRE | REVIEW | Approved | |
12/09/2021 | SBLOOD1 | ENGINEERING | REVIEW | Passed | |
12/15/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. General: Please provide a site plan and a building plan indicating the location of the new HVAC units. 2. General: Please indicate the weight of the old units on the building plan drawing and the weight of the new units. Verify if a structural analysis is required for the existing roof structure to support the new units. |
12/28/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Replacement of AC units constitutes new work so the submittal will require a heating/cooling load calculation to justify the capacities of the units being installed (Sections C403.3.1 and C403.2.2, IECC 2018). While ventilation calculations are not required, a test and balance report is required to verify that the total supply airflow and the outside airflow are at least equal to that which the previous AC unit provided. |
12/28/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
12/28/2021 | ROBERT SHERRY | WATER | REVIEW | Passed | |
12/29/2021 | STEVE SHIELDS | ZONING | REVIEW | Passed | |
12/29/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |