Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T21CM09269
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/22/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Approv-Cond | Activity Number: T21CM09269 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Subject to Field Approval ELECTRICAL REVIEW COMMENTS Conditionally Approved Subject to Field Approval PLUMBING REVIEW COMMENTS: Conditionally Approved Third Plumbing Review: 1 thru 6 Ok 7). The Schirer GB75 grease interceptor selected is an Hydromechanical type, per Tucson Plumbing code amendment 1003.3 this type can only be used for 4 fixtures or less. ( suggest 1 concrete gravity type, or multiple hydromechanical) **THE GB75 GREASE INTERCEPTOR OK & APPROVED BY LETTER FROM STEVE VALENICIA WITH PIMA COUNTY INDUSTRIAL WASTE WATER CONTROL, LETTER IS ATTACHED TO THE SUBMITTAL #3 RESPONSE COMMENTS** PROCEED AT OWN RISK SUBJECT TO FIELD VERIFICATION 8). OK 9). Plan P-6 grease interceptor sizing calculations are stating a 100 GPM unit is required for a 2 minute rating. A 75 GPM unit was selected. update page information -IPC 1003.3.5 **THE GB75 GREASE INTERCEPTOR OK & APPROVED BY LETTER FROM STEVE VALENICIA WITH PIMA COUNTY INDUSTRIAL WASTE WATER CONTROL, LETTER IS ATTACHED TO THE SUBMITTAL #3 RESPONSE COMMENTS** PROCEED AT OWN RISK SUBJECT TO FIELD VERIFICATION 10 thru 12 OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
| 04/26/2022 | SBLOOD1 | ENGINEERING | REVIEW | Approved | |
| 04/27/2022 | STEVE SHIELDS | ZONING | REVIEW | Approved |