Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T21CM09269
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/07/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM09269 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionaly Approved Subject to Field Approval ELECTRICAL REVIEW COMMENTS Conditionally Approved Subject to Field Approval PLUMBING REVIEW COMMENTS: Denied Second Review: 1 thru 6 Ok 7). SAME-The Schirer GB75 grease interceptor selected is an Hydromechanical type, per Tucson Plumbing code amendment 1003.3 this type can only be used for 4 fixtures or less. ( suggest 1 concrete gravity type, or multiple hydromechanical) **TUCSON AMENDENT DOESN'T SHOW ANY EXCEPTIONS FOR APPROVAL FROM WASTE WATER DEPT.** SUGGEST CONTACT B.O. 8). OK 9). SAME-Plan P-6 grease interceptor sizing calculations are stating a 100 GPM unit is required for a 2 minute rating. A 75 GPM unit was selected. update page information -IPC 1003.3.5 ( this comment is also affected by comment #7) **TUCSON AMENDENT DOESN'T SHOW ANY EXCEPTIONS FOR APPROVAL FROM WASTE WATER DEPT.** SUGGEST CONTACT B.O. 10 thru 12 OK |
| 03/14/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM09269 348 E Elvado Rd – O-3 New Religious Use Bldg (2nd Review) TRANSMITTAL: March 14, 2022 This site is located in the O-3 zone (UDC 4.7.15). Religious Use is a permitted use in the zone, (UDC TABLE 4.8-3) subject to Use Specific Standard 4.9.13.K. 1. This comment was not addressed. Zoning has reviewed the building plans for compliance with DP20-0172. The building plans show a proposed canopy along the west side of the building, that was not shown on the DP. A revision to the DP showing the proposed canopy will need to be submitted and approved prior to approval of this building plan. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
| 04/13/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | See previous comment for need of a floodplain use permit. |