Review Details: RESUBMITTAL
Permit Number - T21CM09255
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/07/2022 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not addressed, both the envelope and mechanical COMcheck compliance certificates are still shown as "addition", not "new construction". [Initial comment: Revise the energy code compliance for the building envelope and the mechanical systems to show the structure is new construction, not an addition to an existing building. Note that the interior lighting has been designed to comply with Section C406.3, IECC 2018 so no further "Additional Efficiency Package Option" will be required. Reference: Sections C202, International Energy Conservation Code 2018.] 2. The drawings show the roof and wall insulation as "future", but the heat pump is to be installed as part of this activity. Without the insulation, the building envelope is non-compliant. [Initial comment: The R and U value note on sheet TS1 calls for R-38 roof cavity insulation and R-21 wall cavity insulation. The COMcheck envelope compliance components show R-38 roof cavity insulation but no wall insulation. The drawings, however, show no insulation for either the roof or the walls.] |
02/07/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed |