Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - NEW
Permit Number - T21CM09255
Review Name: COMMERCIAL - NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/01/2022 | SBLOOD1 | ENGINEERING | REVIEW | Passed | |
12/07/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
12/07/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
12/14/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Provide the dimensions of the roof scuppers. Reference: Section 1106.5, IPC 2018. 2. Provide secondary (overflow) roof drainage. Note that the "overflow cutout" does not qualify as a secondary (overflow) scupper. Reference: Sections 1108.1, 1108.2 and 1108.3, IPC 2018. |
12/14/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the energy code compliance for the building envelope and the mechanical systems to show the structure is new construction, not an addition to an existing building. Note that the interior lighting has been designed to comply with Section C406.3, IECC 2018 so no further "Additional Efficiency Package Option" will be required. Reference: Sections C202, International Energy Conservation Code 2018. 2. The R and U value note on sheet TS1 calls for R-38 roof cavity insulation and R-21 wall cavity insulation. The COMcheck envelope compliance components show R-38 roof cavity insulation but no wall insulation. The drawings, however, show no insulation for either the roof or the walls. 3. Include the three windows and four skylights as envelope components and revise the entry door to comply with the fenestration requirements as a non-opaque door. Reference: Section C402.4, IECC 2018. |
12/14/2021 | ROBERT SHERRY | WATER | REVIEW | Passed | |
12/20/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
12/24/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
12/24/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/01/2022 | NGARCIA3 | OUT TO CUSTOMER | Completed |