Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T21CM09221
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/18/2022 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM09221 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Approved BUILDING REVIEW COMMENTS: Approved 1. On almost every page of the drawing set, the file seems corrupted and there are lines running through the floor plan. 2. On almost every page of the drawing set, lines are missing from the drawing. Please correct drawing and provide a completed drawing. MECHANICAL REVIEW COMMENTS: Denied 1. Provide mechanical plans (IMC2018,106.3.1) Not Complied ELECTRICAL REVIEW COMMENTS Denied No electrical design provided as per Sheet 001, General Notes-Project; Item B4 This note states that an Electrical design will be provided by the Electrical contractor. Until such design is submitted, the electrical permit cannot be approved. Electrical permit application: Denied. PLUMBING REVIEW COMMENTS: Denied 1). OK 2). Response to comment 1 states see General notes B-4 on Plan page 001. Are these notes insinuating that there is more plumbing work than just the fixture replacements being shown on the current plans that is being permitted separately? is that permissible by the jurisdiction? -IPC A106.3.1 |
01/24/2022 | SAMUEL ROGERS | ZONING | REVIEW | Approved |