Permit Number: T21CM09202
Parcel: 119421830

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T21CM09202
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/06/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A0.0; Building Code Analysis: The Allowable Building Area indicates 9000 SF. Please revise that number per the IBC Table 506.2 where the space has an automatic sprinkler system.
2. Sheet A0.0; Building Code Analysis: Please revise the Allowable Building Height using the IBC Table 504.3 where the space has an automatic sprinkler system, and revise the Allowable Number of Stories using the IBC Table 504.4 where the space has an automatic sprinkler system.
3. Sheet A0.1; Frame Construction: This section lists only wood framing, while the details on Sheet A2.0 indicates only steel studs for the wall framing. Please provide steel stud construction for the wall framing on Sheet A0.1. Include the framing size, spacing, and gauge.
4. Sheet A1.4; Reflected Ceiling Plan: Please indicate the exit lighting on this plan.
5. Sheet A2.0; Details: Two details on this sheet have no notes. Please verify.
6. Sheet A2.2: These are typical concrete and masonry structural details. Are these pertinent to this project? Please verify.
7. General: Please provide written responses to all review comments.
12/06/2021 JPEELDA1 FIRE REVIEW Approved
12/08/2021 ROBERT SHERRY WATER REVIEW Completed
12/09/2021 SBLOOD1 ENGINEERING REVIEW Passed
12/14/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change 1. Coordinate the plumbing fixture schedule and the plumbing fixture specifications (e.g. is P1 a water closet or a lavatory?). Reference: Section 107.2.1, IBC 2018.
2. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Show how the new plumbing fixtures connect to the existing plumbing systems. Reference: Section 107.2.1, IBC 2018.
3. Identify the material standards for the water distribution piping materials and fittings. Reference: Section 605.4, IPC 2018.
4. The water heater detail includes a hot water recirculation system. Clarify how this system is being installed (e.g. provide a water distribution isometric). Reference: Section 107.2.1, IBC 2018.
5. Show the location where the drain from the water heater pan terminates. The drain from a pan located under a water heater shall terminate either to an indirect waste receptor or to the exterior of the building. The tailpiece of a fixture is not an approved indirect waste receptor. Reference: Sections 504.7.2 and 802.4, IPC 2018.
6. Verify that the distance from the hot water source to the hot water termination for the public lavatory complies with the requirements of Section C404.5, IECC 2018.
12/14/2021 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change 1. Provide calculations and a mechanical design to verify that adequate ventilation will be provided for the occupied spaces. Reference: Section 403.3.1.1, IMC 2018.
2. Show the size, route, and termination of the dryer exhaust duct. Reference: Sections 504.1, 504.2, 504.4, 504.6, and 504.8.6, IMC 2018.
12/20/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the electrical plan review comments and provide a written response.

1 . Provide a complete luminaire schedule. 2. Provide compliance with the 2018 IECC for the lighting. 3. Provide a complete panel schedule including load calculations. 4. Revise the NEC code reference to the currently adopted 2017, also ARC Fault protection is not required for commercial buildings unless classified as residential. NEC art 210.

Ref; 2018 IBC sec 107.1, 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements
12/21/2021 IMONSHI1 ZONING REVIEW Approved
12/21/2021 IMONSHI1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed