| 11/26/2021 | SBLOOD1 | ENGINEERING | REVIEW | Passed | |
| 11/26/2021 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 11/30/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 12/01/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
| 12/01/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Show all code-required cleanouts and the vents. Reference: Section 107.2.1, IBC 2018. 2. Clarify what is occurring with the two horizontal drains near the bag-in-box. Where is the existing building drain? Is that third floor sink by the bag-in-box? Reference: Section 107.2.1, IBC 2018. 3. Coordinate the plumbing schematic with the plumbing plan. If the plumbing schematic is correct, there will only be one horizontal drain, not two, and a cleanout will be required. Reference: Sections 708.1, 909.1, and 911, IPC 2018. 4. Indirect waste receptors shall not be installed in concealed spaces. Provide ready access to the waste receptor. Reference: Section 802.4, IPC 2018. |
| 12/01/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 12/13/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 12/13/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 12/15/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |