Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T21CM08552
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/19/2022 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical plan review comments and provide a written response. Some comments may have changed due to re- design of the electrical service equipment in relation to the last submittal. Ref; Line diagrams, PV 3.0, PV 4.0. The electrical secondary service feeder conduit and conductor sizes for 3 phase installations are calculated by the Electrical Engineer of record per load demand of the building being served, NEC 220, 230.30, not included per TEP SR Requirements. Please provide on the plans, conduit, conductor sizes and types, and quantities, that correlate with Engineered load calculations. Provide a grounding detail for the new electrical service per NEC 250. Ref; 2018 IBC sec 107.2, 2017 NEC, City of Tucson Commercial Plan/Permit Submittal Requirements. |