Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM08491
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/01/2021 | SBLOOD1 | ENGINEERING | REVIEW | Passed | |
| 11/09/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 11/09/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the envelope compliance certificate to correspond to the proposed changes to the building envelope (e.g. furring in exterior wall, adding R-38 insulation to roof). 2. Revise the mechanical compliance certificate using Table CC403.3.2 (2), IECC 2018. The specified heat pumps are not packaged terminal heat pumps. 3. The HVAC load analysis shows a total load of 7.91 tons of cooling for the warehouse, but the plans call for four 5-ton HVAC units. How is this justified? Reference: SectionsC403.1.1 and C502.2.3, IECC 2018. 4. Show the size, routing, and termination of the condensate drains for the HVAC units. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson. |
| 11/09/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 11/09/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 11/16/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 11/19/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 11/19/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 11/23/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |