| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/22/2021 | ANY | ZONING | REVIEW | Active | |
| 10/22/2021 | ANY | ENGINEERING | REVIEW | Active | |
| 10/22/2021 | ANY | ELECTRICAL-COMMERCIAL | REVIEW | Active | |
| 10/22/2021 | ANY | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Active | |
| 11/01/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 11/01/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 11/02/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | This activity eliminates six water closets, two urinals and six lavatories from building 15. Provide calculations to show that the contestants, wranglers, and the occupants of four sets of bleachers located east of the arena will have adequate plumbing facilities within 500-feet. Reference: Sections 403.1 and 403.3.3, IPC 2018. |
| 11/02/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide locking access port caps for the condensing units per Section 1101.10, IMC 2018 or locate the condensing unit in a controlled space. |
| 11/02/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A-1 (Demolition Floor Plan); Sheet A-1 (Proposed Floor Plan): The Demolition Floor Plan indicates 8 existing water closets, 2 existing urinals, and 6 existing lavatories in the restroom area to be removed. The Proposed Floor Plan indicates 2 new water closets and 2 new lavatories are to replace the removed fixtures. From the Site Plan on Sheet SD-1, it appears these restrooms could serve occupants not only in the Committee Building, but also from the bleachers, animal pens, Press Media Building, Staging Area, and Lion's Building. Please verify with calculations on the drawings the plumbing fixtures provided in this building meet the requirements of the IBC Table 2902.1 and Section 2902.3.3 for water closets and sinks in this area. 2. Sheet A-1; Wall Legend: For New Walls (Interior), please indicate the metal stud gauge required. 3. Sheet A-1; Wall Legend: The New Walls (Interior) reference Details 5/A2 and 6/A2. Please revise those references. 4. Sheet A-1; Proposed Floor Plan: A section cut on the west wall at the work counter references 6/A2. Please revise that reference. 5. General: Please provide written responses to all review comments. |