| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/01/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 11/03/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
| 11/04/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM08161 1302 S Kolb Rd – C-2 New Salad and Go TRANSMITTAL: November 4, 2021 COMMENTS: the following comments are relative to an application for Rio Nuevo Area (UDC 5.12.7). This site is located in the C-2 zone (UDC 4.7.21). Food Service is an allowed use in the zone (UDC Table 4.8-4), subject to Use Specific Standards 4.9.4.M.1 and 4.9.13.P. 1. Zoning has reviewed this building plan for compliance with DP21-0275 and although it appears that the plans match Zoning cannot approve the building plans until the DP has been approved and the following comments are addressed. 2. The development package sheets submitted in the building plan set either need to be the stamped approved drawings, marked as for reference only or removed from the building plans. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
| 11/04/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 11/12/2021 | WBERGER1 | ENGINEERING | REVIEW | Passed | |
| 12/27/2021 | SAFEBUILT | 2ND PARTY REVIEW | REVIEW | Reqs Change | Activity Number: T21CM08161 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Structural steel, components and fasteners which are exposed to weather are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1. 2. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. 3. Continuous wall foundation WF2.0 is marked on the Foundation Plan S101. Provide reinforcing details for WF2.0. 4. Column Foundation CF2.0 is marked along line 2 between A & C. Verify and make revisions as needed. 5. Wall Foundation WF5.5 is marked along A between 2 and 3 on Foundation Plan S101. Provide reinforcing details for WF5.5. 6. Locate Section 106/S401 shown on S401 on Foundation Plan S101. 7. Locate Section 307/S601 shown on S601 on Roof Plan S301. BUILDING REVIEW COMMENTS: Denied 1. No egress plan is provided. Provide a thorough egress plan. 2. Remove details that are not being utilized. (i.e. roof access hatch detail) MECHANICAL REVIEW COMMENTS: Approved ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/27/2021 | VVERA1 | OUT TO CUSTOMER | Completed |