Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Permit Number - T21CM07983
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/21/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM07983 1415 E Seneca St – 2 bedrooms, family room & kitchen addition NR-1 TRANSMITTAL: October 21, 2021 COMMENTS: the following comments are relative to an application for NPZ Review (UDC 5.10.3). This site is located in the NR-1 zone (UDC 5.10.3). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.5 - 9. Prior to zoning approval an NPZ review and approval is required. Owner is proposing to construct 2 bedrooms, family room & kitchen addition to the rear of the existing dwelling. The property fronts on one local streets Seneca. Structure meets. NPZ review shall be completed prior to approval of the building plans. |
10/29/2021 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | This project is within a mapped flood hazard area and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://docs.tucsonaz.gov/Forms/tucsonpermitapp. Instructions: 1. Is this for a new or existing activity application? - Please select New Application. 2. Submission Type - Select Floodplain Use Permit. 3. Project Name - Enter a name for your project. 4. Type of Permit - Select Commercial or Residential (Residential is for work on single family residences and duplexes.) 5. Select Street Name from the list. You can type the first two letters or number to get closer to your choice in the list. Then select the rest of the address in the boxes provided. 6. Description of Work - Enter in Floodplain Use Permit for…and then put a description of the work being done or reference the building permit number associated with this floodplain use permit. 7. Complete the Applicant Info. (Note APA# is for applicants with an advance payment account. Leave blank is you do not have an APA account. 8. Complete the Contractor, Owner and Architect/Engineer sections as applicable. 9. Supporting Documentation Upload - Provide a complete cost estimate for the project unless it is for a new build/separate structure. You may also provide additional documents you think will be helpful. 10. Sign the application and submit. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
11/02/2021 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | T21CM07983 PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. SITE PLAN: 1. Indicate the location and size of the water line from property line (meter) to building, R106.1.1. Show an existing or upgraded 1” line to the water heater, P2903.7. PLANS: 1. Provide manufacturer’s calculations and data for pre-engineered trusses dated and wet-sealed by an engineer who is registered in Arizona, or notate the requirement for deferred submittal, R106.1. Clarify if the framing plan has trusses or rafter joist. SECTIONS - DETAILS: 1. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing, R806.5. Show a roof design with insulation types and minimum thickness for meeting the condensation control requirement and the minimum total insulation value of R-38. PLUMBING PLANS: 1. Tucson Water Department limits flow rates for each water meter size in compliance with P2903.7. Show an appropriate yard pipe bypassing the existing dwelling and an upgraded water meter size. MECHANICAL PLANS: 1. Provide (an HVAC system with fresh air intake) whole-house mechanical ventilation, or controlled exhaust with a calculated airflow rate, R303.4; N1103.6 & M1505.4. Show the system and appropriate flow rate setting on the plans. A four bedroom dwelling of 1501 – 3000 SF requires a 75 CFM continuous setting. 2. Provide demand calculations in accordance with Manual J/S/D standards, M1401.3, M1601.1. Systems shall be sized in accordance with Manual S based on building loads calculated in accordance with Manual J and duct systems sized in accordance with Manual D. Notate if the mechanical plans if system calculations will be provided by deferred submittal. ELECTRICAL PLANS: 1. Show or notate the requirement for a carbon monoxide detector outside of bedroom doors, when the dwelling includes an attached garage or gas appliance, R315. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans. Please contact the plans reviewer if you have any questions: Ken Van Karsen (520) 837-4912 PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review |