Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T21CM07976
Parcel: 13355231B

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T21CM07976
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/22/2021 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM07976

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

STRUCTURAL REVIEW COMMENTS:
Denied
1. Refer Detail 8/S521 and 9/S521. Untreated Lumber is called out for 6X6 Douglas-Fir #2. Verify and make revision as needed.
2. Refer Detail 11/S521. C6x8.2 is used. Verify if C6 need to be galvanized since it’s exposed to weather.

BUILDING REVIEW COMMENTS:
Denied
1. Sheet A021: The occupant load factors used for the business areas in the occupant load analysis are incorrect. Please correct and recalculate.

MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Approved/subject to field approval

ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E961 INTRUSION SYSTEM FRONT AREA PLAN: Could not locate Notes 2, 3, 4, and 13.

PLUMBING REVIEW COMMENTS:
Denied
1). Notate on plan page P601 the manufacturer name and model number of the wall hung electric water cooler. -IPC A103.6.1
2). Plan page P601 states refer to architectural plans for wall hung electric water cooler mounting height, plan set does not show those heights, please add. -IPC 410.3
3). Lactation room sink on P601 needs tempered water. -IPC 607.1, 607.1.2
4). Add mixing valve manufacturer name & model number of the mixing valve shown on P601 detail #4. IPC A106.3.1
5). Beverage equipment backflows notated on P601 need to include the types & listing standards. ( spec sheets not included as noted) -IPC 608.17.1.2
6). Notate on P601 that the espresso & beverage sink waste will discharge indirectly to a floor sink that is connected to the grease system. -IPC 1003.3 Tucson Amendment
10/27/2021 SSHIELD1 ENGINEERING REVIEW Passed
10/27/2021 ROBERT SHERRY WATER REVIEW Completed
10/27/2021 STEVE SHIELDS ZONING REVIEW Approved
10/27/2021 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
11/16/2021 JPEELDA1 FIRE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
11/16/2021 VVERA1 OUT TO CUSTOMER Completed