Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM07973
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/18/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. General: Please provide structural calculations for the new shade structure. 2. General: Please provide a Special Inspections Certificate with Parts A and B completed. |
10/20/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
10/20/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
10/20/2021 | ROBERT SHERRY | WATER | REVIEW | Passed | |
10/27/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM07973 9434 E 26th St – R-1 Tucson Water Well E-016A – SCADA Upgrades TRANSMITTAL: October 27, 2021 This site is located in the R-1 zone (UDC 4.7.8). A Utility Distribution System is a permitted use in this zone (Table 4.8-2), subject to Use-Specific Standards 4.9.11.A.1, .2, .5, .8, .9, .11 and submittal and approval by a Zoning Examiner Special Exception Procedure, Section 3.4.3. 1. A development package (DP) meeting the requirements of Administrative Manual Section 2-06 must be submitted and approved prior to this permit. The DP is a separate submittal from the building plans and is submitted at: https://docs.tucsonaz.gov/Forms/tucsonpermitapp, using Submission Type, “Site Review”. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
10/27/2021 | SSHIELD1 | ENGINEERING | REVIEW | Reqs Change | See Zoning Comments |
10/27/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
10/27/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
11/03/2021 | JPEELDA1 | FIRE | REVIEW | Approved |