Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM07963
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/14/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet TI-1.0; Development Data: Please provide an occupant load calculation on this sheet. Break down the calculation into Storage and Office. 2. Sheet TI-1.0; Development Data: If the occupant load is 15 or fewer, the IBC Section 2902.2 requires only a single restroom. Please verify and indicate on this sheet. 3. Sheet TI-1.0; Development Data: If the occupant load is 15 or fewer, the IBC Section 2902.6 requires no drinking fountain. Please verify and indicate on this sheet. 4. Sheet TI-1.1; Leasing Office Plan: The plan indicates Sections 6/A5 and 7/A5 at the interior partition walls. The sections provided indicate 4 and 5. Please coordinate the section references and sheet numbers for clarification. 5. Sheet TI-1.1; Interior Elevations: The elevation indicates Section 6/A5 at the cabinet. Please coordinate the section reference and sheet number for clarification. 6. Sheet TI-1.1; Window Elevations: The elevation indicates Section 3/A5 at the window head. Please coordinate the section reference and sheet number for clarification. 7. General: Please provide written responses to all review comments. |
10/20/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Completed | |
10/20/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
10/20/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
10/27/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
10/27/2021 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
10/27/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
10/27/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
11/16/2021 | JPEELDA1 | FIRE | REVIEW | Approved |