Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T21CM07846
Parcel: 11712098A

Address:
1 S CHURCH AV

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T21CM07846
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/09/2022 JPEELDA1 FIRE REVIEW Denied Fire has a lot of issues we are working through with them. We need to be in the workflow for next review, changing mechanical and making notes as to where the IEBC has been applied.

JMPD
02/28/2022 MGAYOSS1 DESIGN PROFESSIONAL REVIEW Denied Reviewed for compliance with approved Development Package (DP20-0164), and with approved design package (T21SA00230, RNA-DRB-21-13).
Thanks for revising elevation drawings/details on Sheets A604, A805, A806, and ID-600. However, Sheet ID-601 still needs to reflect the design package submitted on 9/23/21.
12/15/2021 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM07846

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

STRUCTURAL REVIEW COMMENTS:
Approved


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Approved


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
Approved with the following for information only comments:
E113 PANEL SCHEDULES: No circuits shown for Panel LPH-UB and this panel feeds an existing transformer. Call out existing loads (as existing). Show new circuits if required.
Response: Panel Schedules updated.
Reviewer comment only, no response required: Would suggest to upsize panel as xfmr CB is same size as bus rating of panel.
E122 FEEDER DIAGRAM - LOWER NEW: Cannot locate panels KPD or KPF on Sheet 122: Feeder Wiring Diagram.
Response: Updated Diagram.
Reviewer comment only, no response required: ATS and Conductors on primary side of 75 and 30 KVA transformers could be 3 pole/conductors for typical 480V delta:wye 208V step down transformers.
E203 POWER PLAN - 4TH LEVELS: Could not locate notes 2 and 3.
Response: Updated drawing to address this issue.
Reviewer response, no response required: Still could not locate Note 2. Add or remove as required for construction.


PLUMBING REVIEW COMMENTS:
Denied
Second Review:
1). SAME- First floor public area plumbing plans need to include a High/Low drinking fountain. Update all affected pages.- IPC 403.1, 410.3 Exception not met, the public accessible main floor has other areas besides the restaurant, the free water would only be available to the restaurant customers only.
2-4 OK
5). In reference to this comment from the previous review, now that the intent to use IPC 917 single stack vent system has been clarified. The plumbing plans need to include a larger overall Isometric riser diagram showing this system in its entirety, so the floor to floor continuation will be clear to see that the system complies with IPC 917.1 thru 917.9. -IPC A106.3.1
6). SAME- SEE Review Comment #5-All sanitary/venting systems for the public area & private rooms need to have an associated sanitary/vent riser detail. If the riser details represent multiple areas then label those riser details with the multiple areas served. Update or add to Plan pages P401 thru P405. -IPC A106.3.1
7-9 OK
10). Now that lint interceptor selection has been made, Add a detail to plan pg. P502 illustrating how the JR Smith selected interceptor on plan pg P702 will be implemented into the washer standpipe plumbing. -IPC A106.3.1 (If this is a low flow washer I suggest a Filtrol Model washer hose connection type)
11-12 OK
13). Added shower pan Membrane detail on ID-902 needs to show the waterproof membrane rising 2" above finished threshold height & notate the membrane will be listed to TCNA A118.10 -IPC 421.5.2 & 421.5.2.6
14). OK
15). SAME- Provide complete illustrated gas plans & information for the gas equipment shown on plan pgs. K1-2.1 thru K1-2.3. -IFCG A106.36.1 **PAGES STILL SHOW GAS EQUIPMENT**
16-18 OK
19). #0064 Cappuccino Machine needs to discharge to a waste receptor that is connected to the grease system. Tuscon Amendment IPC 1003.3 Update plan pages P302 & P403
12/15/2021 ROBERT SHERRY WATER REVIEW Completed
12/17/2021 STEVE SHIELDS ZONING REVIEW Approved