Permit Number: T21CM07790
Parcel: 123070160

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO

Permit Number - T21CM07790
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/07/2021 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T21CM07790
2427 E Mabel St – R-1
Convert Detached Storage to 2nd Dwelling Unit w/Porch & Storage Addition (1st Review)

TRANSMITTAL: October 7, 2021
COMMENTS: the following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1).

This site is located in the R-1 zone (UDC 4.7.1). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.5 - 9. 10.

Perimeter yard setbacks are based on a measurement from design grade to the highest point of the exterior wall UDC Article 6.4.5.B & Figure 6.4.5-A.

The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure’s wall facing each interior property line (Table 6.3-2.A).
1. Based on a wall height of 11’-0” the required perimeter yard setback from the proposed storage addition, on the 2nd dwelling unit, to the east property line is 7’-4”, proposed setback is 3’-1”.

2. Based on a wall height less than 9’-0” the required perimeter yard setback from the proposed 2nd dwelling unit to the north property line is 6’-0”, proposed setback is 4’-8

A Design Development Option (DDO) must be submitted and approved to reduce the required setback,
DDO application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. A DDO is a separate submittal from the building plan and shall be submitted at: https://www.tucsonaz.gov/pdsd-filedrop, using the Submission Type “Zoning Administration”. If you have questions about the DDO application or process please contact Mark Castro at Mark.Castro@tucsonaz.gov.

If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov
10/20/2021 SBLOOD1 ENGINEERING REVIEW Passed
10/26/2021 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Reqs Change T21CM07790
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued.

SCOPE OF REVIEW:

The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL REQUIREMENTS:

Each dwelling unit with kitchen requires a separate Pima County assigned street address, R319. Show a new dwelling address on the site plan or remove kitchen appliances.

A new dwelling unit requires collection of development impact fee when the building permit is processed, City of Tucson Ordinance #11203.

GENERAL COMMENTS:

1. A dwelling unit providing complete independent living facilities requires compliance with design ordinances for handicap, solar water, photo-voltaic, gray water and EV charging preparations. Design Ordinances adopted by the City of Tucson.
2. Show compliance with the Inclusive Home Design Ordinance adopted by the City of Tucson Ordinance #10463 on 10/16/2007. Notate accessible route, minimum door width, changes in floor elevation, door hardware, electrical outlet reach range, grab bar reinforcement, etc.
3. All SFR and Duplex plans submitted after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 .
a. Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces.
b. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9.
4. All construction drawings submitted after June 1, 2010 for one- or two-family dwellings must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. The ordinance revision now requires a gray drain line discharge from one fixture for a one story dwelling. Additional gray fixture drains are optional. Show a second clothes washer standpipe plumbed to an exterior wall above grade when feasible, or a bathing fixture drain looped 3’ beyond an exterior wall below grade before connection to the building drain. See details at https://www.tucsonaz.gov/pdsd/water-energy-conservation
5. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space.

PLANS:

1. Show a maximum ½” floor elevation changes at a notated accessible route entrance on the floor plan, R106.1.1. Include the threshold condition at the vehicle doorway or an exterior hinged door when the garage is used for the accessible route.
2. Clarify if trusses are new or existing for the patio cover Roof Framing Plan on sheet 3.
3. Provide manufacturer’s calculations and data for pre-engineered trusses dated and wet-sealed by an engineer who is registered in Arizona for the assembly at detail #1/3, or notate the requirement for deferred submittal, R106.1.

PLUMBING PLANS:

1. Tucson Water Department limits flow rates for each water meter size in compliance with P2903.7. Show an appropriate yard pipe bypassing the existing dwelling and an upgraded water meter size.

MECHANICAL PLANS:

1. Provide (an HVAC system with fresh air intake) whole-house mechanical ventilation, or controlled exhaust with a calculated airflow rate, R303.4; N1103.6 & M1505.4. Show the system and appropriate flow rate setting on the plans. A one bedroom dwelling under 1501 SF requires a 30 CFM continuous setting.

ELECTRICAL PLANS:

1. TEP usually requires the service panel on the property at the closest building to the service transformer. A service line change or a new meter location must be coordinated with TEP for approval.
2. Show service meter on a Riser Diagram for the dwelling and detached building with a single drop from the utility. A feeder is required between buildings, NEC 225.30 and E3403.
3. Provide the Electric Vehicle Supply Equipment 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle and label the circuit “EV Ready”, N1104.2.1. Include the Electric Vehicle load entry (typically 7680 watts) in the electrical load calculations (continuous demand) similar to the HVAC entry, N1104.2.2.

INTERNATIONAL ENERGY CONSERVATION CODE:

1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans.

Please contact the plans reviewer if you have any questions:
Ken Van Karsen
(520) 837-4912 PDSD-Residential@tucsonaz.gov
City of Tucson Residential Plan Review