Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM07727
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/05/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet CVR; Code Information (Occupancy Group): This references the 2006 IBC. Please revise. 2. Sheet CVR; Code Information (Applicable Codes): This references the 2011 ICC/ANSI Accessibility Code and the 2011 NEC. Please revise. 3. Sheet A-7: This is the Preliminary Drawing for Sheet A-6. The Index to Drawings on Sheet CVR describes Sheet A-7 as a "Minor Structural Sheet". Please verify and replace this sheet as required. 4. General: Please provide written responses to all review comments. |
10/12/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Demonstrate energy code compliance for the alteration to the building envelope (i.e. enclosing the front porch) using calculations based on the current code. Reference: Sections C503.1 and C503.3, International Energy Conservation Code 2018. 2. Provide heating and cooling load calculations to justify the heating/cooling capacity of the specified HVAC unit. Reference: Section C403.1.1 and C502.2.3, IECC 2018. |
10/12/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Revise the seal on sheet P-1 to include your last name. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Provide tempered water for the proposed restroom lavatory using a device conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2018. 3. Provide the specifications and listing information for the proposed (or relocated) water heater. Reference: Sections 303.2 and 501.5, IPC 2018 and Section 107.2.1, IBC 2018. 4. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, safety pan, and valves. Reference: Sections 503.1, 504, 606.1, 607.2, and 607.3, IPC 2018. 5. Show how the new water piping relates to the existing water supply system and show that the additional connections do not cause the existing water service and water distribution piping to be overloaded (e.g. water velocity exceeding 8 FPS or excessive water pressure drop). Complete the water calculations shown on sheet P-2. Reference: Section 107.2.1, IBC 2018. 6. Verify that the distance from the hot water source to the hot water termination for the proposed lavatory complies with the requirements of Section C404.5, IECC 2018. |
10/12/2021 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | 1. Verify the need for a reduced pressure backflow preventer for this building with Tucson Water. Reduced pressure backflow prevention assemblies are required to be installed directly after the water meter for buildings that have food preparation or food service facilities. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf 2. Based on the water demand calculation, a demand of 25 GPM (not including hose bibbs) exceeds the capability of a 5/8" water meter. Reference: Tucson Water Policy for water meters, 3/2/2020. |
10/14/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM07727 536 W Palmdale St – C-2 Convert Residence to Commercial Daycare (1st Review) TRANSMITTAL: October 14, 2021 This site is located in the C-2 zone (UDC 4.7.21). Day Care is a permitted use (Table 4.8-4). 1. As this is a change of use from residential to commercial and there have been changes to the site since 2005, this site does not meet the requirements of UDC Article 3.3.3.H and therefore is required to meet code for the change of use. A development package (commercial site plan) is required, see UDC Article 3.3.G.2.c. A development package meeting the requirements of Administrative Manual 2-06 shall be submitted for review. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
10/14/2021 | SSHIELD1 | ENGINEERING | REVIEW | Reqs Change | See Zoning Comments |
10/14/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
10/25/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments and provide a written response. 1. Provide AFCI protected branch circuits as required per NEC 210.12. 2. Provide Tamper Resistant receptacles as required per NEC art 406.12. Ref; 2018 IBC section 107.1.2, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements |
11/03/2021 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Plans show a convection oven. Plans shall reflect a Type II hood system being installed. Plans reflect the 2006 Codes and shall reflect the 2018 Codes Occupant Load is not clear. Plans show that there is a fire alarm but TFD does not have a record and plans show that a fire sprinkler system is now being installed. Please note that fire sprinkler and fire alarm plans are a separate submittal to TFD. Questions: Jennifer Peel-Davis 520-837-7033 Jennifer.Peel-Davis@Tucsonaz.gov |