Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T21CM07725
Parcel: 127080690

Address:
5402 E HOLMES ST

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T21CM07725
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/14/2022 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Reqs Change T21CM07725
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued.

SCOPE OF REVIEW:

The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL REQUIREMENTS:

An ADU is an independently functioning dwelling and requires compliance with the 2018 IRC and City of Tucson building ordinances for Family Dwelling requirements.

Each dwelling unit with kitchen requires a separate Pima County assigned street address, R319. Notate each dwelling address on the site plan (or remove cooking appliances).

A new dwelling unit requires collection of development impact fee when the building permit is processed, City of Tucson Ordinance #11203.

GENERAL COMMENTS:

1. Renovation of a Guest House into a dwelling unit (living space with kitchen) providing complete independent living facilities requires compliance with design ordinances for photo-voltaic and EV charging preparations. Design Ordinances adopted by the City of Tucson.
2. All SFR and Duplex plans submitted after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 .
a. Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces.
b. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9. Update breaker space location.
3. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space.

SITE PLAN:

1. Update the electric line alterations from meter to each building, R106.1.1. Show all utility point of connections without dependance on another dwelling.

ELECTRICAL PLANS:

1. TEP may require the service panel for the property at the closest building to the service transformer. A service line change or a new meter location must be coordinated with TEP for approval.
2. Show a dual service meter on a Riser Diagram for the close dwelling and the feeder size to the detached dwelling service panel, NEC 225.30 and E3403. Coordinate the service meter location with TEP.
3. Update the Riser Diagram showing the 400 AMP upgrade and all panels or sub-panels on the property.
4. Provide the Electric Vehicle Supply Equipment 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle and label the circuit “EV Ready”, N1104.2.1. Include the Electric Vehicle load entry (typically 7680 watts) in the electrical load calculations (continuous demand) like the HVAC entry, N1104.2.2.

Please contact the plans reviewer if you have any questions:
Ken Van Karsen
(520) 837-4912 PDSD-Residential@tucsonaz.gov
City of Tucson Residential Plan Review
03/21/2022 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: T21CM07725
5402 E Holmes St
Addition to SFR (2nd Review)

TRANSMITTAL DATE: March 21, 2022

This site is located in the R-1 zone (UDC 4.7.8). A single-family residence is a permitted use in this zone (Table 4.8-2) subject to Use Specific Standards 4.9.7.B.5 – 9.

COMMENTS: the following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1).

Perimeter yard setbacks are based on a measurement from design grade to the highest point of the exterior wall UDC Article 6.4.5.B & Figure 6.4.5-A.

1. Per UDC TABLE 6.3-2.A: DIMENSIONAL STANDARDS FOR THE R-1, R-2, R-3, MH-1, & MH-2 ZONES, R-1 ZONE, RESIDENTIAL USE TO RESIDENTIAL ZONE the required perimeter yard setback from the proposed addition to the south property line of Parcel is 6’-0’ or 2/3 the height of the exterior wall, greater of the two. Based on a wall height less than 9’-0” the required perimeter yard setback from the proposed addition to the south property line is 6’-0”, proposed setback is 1’-0”. A Design Development Option (DDO) must be submitted and approved to reduce the required setback,
DDO application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. A DDO is a separate submittal from the building plan and shall be submitted at: https://www.tucsonaz.gov/pdsd-filedrop, using the Submission Type “Zoning Administration”. If you have questions about the DDO application or process please contact Mark Castro at Mark.Castro@tucsonaz.gov.