Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM07641
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/10/2022 | LSHAMIS1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
09/27/2021 | JPEELDA1 | FIRE | REVIEW | Reqs Change | 1) Plans shall show all codes referenced 2) Plans shall show occupant load and type 3) Plans shall show type of construction 4) Plans shall show if the building has a fire sprinkler system 5) Plans shall show if the building has a fire alarm system 6) Plans shall show existing space and areas to be demolished Questions: Jennifer Peel-Davis Jennifer.Peel-Davis@Tucsonaz.gov 520-837-7033 |
10/04/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheets 1, 2, and 3; Enlarged Note: A note at the top of the sheet indicates "all work shall comply with the 2018 IRC". This is a commercial hotel and requires submittal documents that meet the requirements of the 2018 IBC Section 107. Please provide that information on these documents. 2. Sheet 1: Per the IBC, this sheet must bear the seal, signature, and date of a registered design professional. Please provide. 3. Sheet 2; Foundation Notes: The first note indicates an assumed soil bearing capacity of 1500 PSI at a minimum 12" bearing into natural soil. For an assumed soil bearing value, please indicate 1500 PSF at a minimum 18" bearing into natural soil, or 1000 PSF at a minimum 12" bearing into natural soil. 4. Sheet 2; Foundation Plan: Are the exterior walls and foundations (Section 1/3) existing? Please indicate on the Foundation Plan and all sections as required. 5. Sheet 2; Floor Plan: Are the interior walls and foundations (Section 2/3) existing? Please indicate on the Floor Plan and all sections as required. 6. Sheet 2; Foundation Notes: Please remove all references to the IRC. 7. Sheet 3; Roof Framing Plan: Please provide a section on this sheet for the connection of the new interior GLB to the new 3 ply 2x6 post. 8. Sheet 3; Roof Framing Notes: Please remove all references to the IRC. 9. Structural Calculations; Sheet 2: Please revise the IRC 2018 note and the soil bearing pressure allowed (1000 PSF at 12", 1500 PSF at 18"). 10. General: Please provide written responses to all review comments. |
10/07/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide a mechanical design and calculations performed by an Arizona registrant who has demonstrated proficiency through registration, education, technical knowledge, or experience to perform such work. Reference: Sections 107.1 and 107.2.1, IBC 2018. |
10/07/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Provide a plumbing design and calculations performed by an Arizona registrant who has demonstrated proficiency through registration, education, technical knowledge, or experience to perform such work. Reference: Sections 107.1 and 107.2.1, IBC 2018. |
10/07/2021 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Provide the size of the water meter serving this suite, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018. |
10/13/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
10/19/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Provide complete electrical plans design and calculations performed by an Arizona registrant. Reference: Sections 107.1 and 107.2.1, IBC 2018, 2017 NEC |
10/21/2021 | SBLOOD1 | ENGINEERING | REVIEW | Passed |