Permit Number: T21CM07563
Parcel: Unknown

Address:
1315 S 11TH AV

Review Status: Completed

Review Details: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO

Permit Number - T21CM07563
Review Name: RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/23/2021 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T21CM07563
1315 S 11th Av
New SFR

TRANSMITTAL: September 23, 2021
This site is located in the R-3 zone (UDC 4.7.12). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.6.

1. Provide a lot coverage calculation that meets the requirements of UDC Article 6.4.3 and the example shown on the requirement for a Residential Plot Plan found at: https://www.tucsonaz.gov/files/pdsd/forms/Residential_Plot_Plan_Requirements.pdf

2. Perimeter yard setbacks are based on a measurement from design grade to the highest point of the wall, see Unified Development Code (UDC) Article 6.4.5.b & Figure 6.4.5-A. Per UDC TABLE 6.3-2.A: DIMENSIONAL STANDARDS FOR THE R-1, R-2, R-3, MH-1, & MH-2 ZONES, R-3 Zone, residential use to a residential zone the required perimeter yard setback is 6’-0” or 2/3 the height of the exterior wall, greater of the two. As dimensions from design grade were not provided on the drawings Zoning has added 6” to the provide dimensions to determine required setbacks. Based on a 11’-0” the required perimeter yard setback to the north & south property line is 7’-4” provided setback to the north is 6.5’ and to the south is 6.4’. A Design Development Option (DDO) will need to be submitted and approved for the reduced setbacks. DDO application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. A DDO is a separate submittal from the building plan and shall be submitted at: https://www.tucsonaz.gov/pdsd-filedrop, using the Submission Type “Zoning Administration”. If you have questions about the DDO application or process please contact Mark Castro at Mark.Castro@tucsonaz.gov.

If you have any questions about this transmittal, please contact Elisa Hamblin at ElisaHamblin@tucsonaz.gov.
10/13/2021 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Reqs Change T21CM07563
PLAN REVIEW COMMENTS

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued.

SCOPE OF REVIEW:

The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL REQUIREMENTS:

The City of Tucson adopted the 2018 IRC with amendments on 1/1/2019. Show the current code reference on the plans.

Each dwelling unit with kitchen requires a separate Pima County assigned street address, R319. Show all dwelling addresses on the site plan or remove kitchen appliances.

A new dwelling unit requires collection of development impact fee when the building permit is processed, City of Tucson Ordinance #11203.

GENERAL COMMENTS:

1. A dwelling unit providing complete independent living facilities requires compliance with design ordinances for handicap, solar water, photo-voltaic, gray water and EV charging preparations. Design Ordinances adopted by the City of Tucson.
2. All SFR and Duplex plans submitted after March 1, 2009 require a solar water system, or future installation preparation City of Tucson Ordinance #10549 with one of the following provisions: ½”control conduit and two ¾” copper piping for water with rooftop termination; straight 3” capped sleeve; or an accessible attic (clear path 30” wide x 30” high) over the water heater. Show appropriate notation.
3. All SFR and Duplex plans submitted after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 .
a. Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces.
b. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9. Update breaker location.
4. All construction drawings submitted after June 1, 2010 for one- or two-family dwellings must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. The ordinance revision now requires a gray drain line discharge from one fixture for a one story dwelling. Additional gray fixture drains are optional. Show a second clothes washer standpipe plumbed to an exterior wall above grade when feasible, or a bathing fixture drain looped 3’ beyond an exterior wall below grade before connection to the building drain. See details at https://www.tucsonaz.gov/pdsd/water-energy-conservation
5. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space.

FLOOR PLANS:

1. Show a maximum ½” floor elevation changes at a notated accessible route entrance on the floor plan, R106.1.1. Include the threshold condition at the vehicle doorway or an exterior hinged door when the garage is used for the accessible route.

SECTIONS - DETAILS:

1. An unvented roof assembly requires an air-impermeable rigid insulation material with a minimum R-5 value applied correctly to either side of the roof sheathing, R806.5. Show a roof design with insulation types and minimum thickness for meeting the condensation control requirement and the minimum total insulation value of R-38.

MECHANICAL PLANS:

1. Provide (an HVAC system with fresh air intake) whole-house mechanical ventilation, or controlled exhaust with a calculated airflow rate, R303.4; N1103.6 & M1505.4. Show the system and appropriate flow rate setting on the plans. A two or three bedroom dwelling of 1501 – 3000 SF requires a 60 CFM continuous setting.

ELECTRICAL PLANS:

1. Provide the Electric Vehicle Supply Equipment 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle and label the circuit “EV Ready”, N1104.2.1. Include the Electric Vehicle load entry (typically 7680 watts) in the electrical load calculations (continuous demand) similar to the HVAC entry, N1104.2.2.

INTERNATIONAL ENERGY CONSERVATION CODE:

1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans.

Please contact the plans reviewer if you have any questions:
Ken Van Karsen
(520) 837-4912 PDSD-Residential@tucsonaz.gov
City of Tucson Residential Plan Review
10/20/2021 SBLOOD1 ENGINEERING REVIEW Passed