Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM07551
Review Name: COMMERCIAL - TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/22/2021 | JPEELDA1 | FIRE | REVIEW | Reqs Change | Plans shall show the fire department access Plans shall show if the building has fire sprinkler and or fire alarm system Plans shall show the deferred submittals |
| 09/28/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1; Project Data: Please provide a calculation on this sheet for the occupant load of the new addition, and for the total combined occupant load of the existing building + the addition. 2. Sheet A1; Project Data: Please provide calculations on this sheet for the required plumbing fixtures per the IBC Table 2902.1, including the total occupant load for the existing building + the addition. Verify on the site plan the location of the existing plumbing fixtures, and verify the requirements of the IBC Section 2902.3.3 are met for travel distances. 3. Sheet A1; Project Data: Please indicate on this sheet if the existing building or the addition will have an automatic sprinkler system and fire alarm system. 4. Sheet A1: Please indicate the current codes applicable to this project on this sheet. 5. Sheet A1; Drawing Index: Please coordinate the Drawing Index with the actual sheet numbers in this submittal set. 6. Sheets S1 and S2: Please provide the signed and dated seal of the registered structural engineer on these sheets. 7. Sheets S1 and S2: Please coordinate all section cuts on the structural plans with the sections indicated on Sheet S2. 8. Sheet S1; General Structural Notes: Please update all notes to the 2018 IBC. 9. Sheet S1; Framing Schedule: Please indicate Truss T1 and T2 configurations on this sheet. 10. Sheet S1; Framing Plan: Beam B-2 indicated on the Framing Plan is not in the Framing Schedule. Please verify. 11. General: The title block on all sheets does not appear to be complete and lacks sheet numbers. Please verify. 12. General: All sheets appear to have been sealed, signed, and dated in 2013. Please update per the IBC Section 107. 13. General: Please provide a Special Inspections Certificate with Parts A and B completed. This form may be found on the City of Tucson website at www.tucsonaz.gov/PDSD. 14. General: Please provide written responses to all review comments. |
| 09/30/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | 1. Demonstrate energy code compliance for the addition to the building envelope using calculations based on the current code. The 2018 International Energy Compliance Code is the relevant energy code for this project, not the 2012 IECC. 2. Include the entrance door in the energy code analysis. Reference: Sections C103.2, C303, C503.1, and C503.3, International Energy Conservation Code 2018. 3. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC unit. Reference: Section C403.1.1 and C502.2.3, IECC 2018. |
| 09/30/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 09/30/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
| 10/11/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM07551 510 S Highland Ave – R-2 Classroom Addition (1st Review) TRANSMITTAL: October 11, 2021 This site is located in the R-2 zone (UDC 4.7.9). Education – Elementary & Secondary is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.3.D.1-7. 1. Clarify what is proposed for this site. The submitted drawings appear to be the same drawings, T13CM02068, submitted, approved and a C of O was issued, back in 2013. If there is another addition proposed clearly show this on the plan and submit a development package meeting the requirements of AM 2-06. If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov. |
| 10/11/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
| 10/14/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | The electrical plans E1 and E2 where not included in the submittal. |
| 10/15/2021 | NROSS1 | ENGINEERING | REVIEW | Passed |