Permit Number: T21CM07491
Parcel: 137055570

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T21CM07491
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/28/2021 JPEELDA1 FIRE REVIEW Reqs Change Building shall be provided with Aerial Fire Apparatus Access Road per IFC Appendix D Section D105-105.4. Please show FD aerial access on your plans.
Road entry shows that it is 24' it shall be 26'.
Buildings exceeding three stories or 30' in height shall have not fewer than two means of fire apparatus access for each structure.
Fire hydrant shall be located within 100' of the Fire Department Connections.
Fire hydrant shall be located within 600' of all parts of the structure, please provide hose diagram as the hose lays.
Drawings shall show that two-way communication outside of the elevator is required.
Drawings shall show that the interior elevator communication system is 2018 IBC compliant
Drawings shall show: Emergency Responder Radio Coverage test is required and the results provided to TFD. If the building fails, a system shall be installed at the owners expense.
Drawings shall show clear detail of roof access ladder.


Questions:
Jennifer Peel-Davis
Jennifer.Peel-Davis@Tucsonaz.gov
520-837-7033
10/05/2021 SAFEBUILT 2ND PARTY REVIEW REVIEW Reqs Change Activity Number: T21CM07491

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.

STRUCTURAL REVIEW COMMENTS:
Denied
1. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1.
2. Non-load bearing walls require a deflection track or details to allow for the relative lateral deflection of the structural members.
3. Areas used for storage are to include 25% of the live load in determining the effective seismic weight. Verify the additional load is applied to the lateral resisting system as required in ASCE-7 Section 12.7.2.
4. Submit documentation regarding implementation of Special Inspections and Testing program during construction to observe compliance with the Design Concepts and Specifications.
5. Provide schedule of special inspections as required in IBC Section 1705.
6. The North shown on Arch and Structural drawings doesn’t match with Civil Drawings. Verify and make correction as needed.
7. Refer Drawing S500 Detail A5. The dimensions shown does not match dimensions shown on Floor Plan Drawing S100 or A050. Verify and make revisions as needed.
8. Structural general notes are to include any components of the building that may be considered deferred submittals. IBC Section 107.3.4.1 requires deferred submittals to be approved by the building official. Examples of items that likely should not be deferred include deep foundation elements, deep excavation shoring and prefabricated metal buildings.
If items will be deferred the plans are to clearly note the following per IBC Section 107.3.4.1:
* To be reviewed by design professional in responsible charge.
* Design professional shall affix a notation that the deferred items are in general conformance with their design of the building.
* They shall be submitted for review by the building official.
* Shall not be installed until approved by building official.
Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings
BUILDING REVIEW COMMENTS:
Denied
1. Provide attic draftstopping detail along with draftstopping area calculations.
2. The fire resistance rating of the horizontal assemblies between floors is required to not be less than 1-hour according to the construction type and Section 711.2.4.1, 711.2.4.3, 420.3
MECHANICAL REVIEW COMMENTS:
Denied
1. Provide ventilation calculation tables (IMC2018,403.3.1.1.1)
2.Bathroom exhaust ducts that penetrate more than 2 stories shall be encased in a shaft (IMC2018,607)
3.Bathroom exhaust ducts that penetrate not more than 2 floors shall be protected by fire dampers (IMC2018,607.6.1)
4.Dryer ducts penetrating fire rated ceiling shall be protected in an approved manner (IMC2018,607.6.2)
5.Provide ceiling radiation damper where duct penetrates fire rated floor/ceiling assembly (IMC2018,607.6.
6. Provide a level platform to appliance on roof with a slope of 3/12 or greater in an approved manner (relief hood, roof hatch) (IMC2018,306.5.1)

ELECTRICAL REVIEW COMMENTS
Denied
E100 ELECTRICAL SITE PLAN: Cannot locate Note #3
E401 ENLARGED PLANS AREA 'A' - POWER:
Could not locate Note # 13.
Note #14 needs to be updated, currently is labeled Note #1.
E601 SERVICE ENTRANCE RISER DIAGRAM:
Need a panel schedule with CBs and loads for MDP
Missing 125A circuit breaker for Rm#212.
Missing CB for Rm 106, but have two CBs for Rm 107.
E602 LIGHTING FIXTURE SCHEDULE:
Need a lighting Comcheck, both interior and exterior.
Not all light fixtures have a symbol. Are they missing?

PLUMBING REVIEW COMMENTS:
Denied
1). Plan pages A051, A052, A105 appear to show primary & secondary roof drains. Plans need to include a roof drain piping riser diagram along with roof drain, conductor sizes & calculations & piping materials that derive from -IPC 1106.2, 1106.3 , 1102.6, 1102.7
2). Plan pages A105, A200, A201 need to include Gutter & Downspout sizes & calculations that derive from -IPC 1106.3 & 1106.6
3). Plan Page A021 main floor public occupant load requires separate mens & womens restrooms, only one restroom shown.. -IPC403.2 update all pages affected
4). Add plumbing fixture manufacturer names & model numbers to plan page P601 or include a specification manual with plan submittal. A106.31
5). Add fixture spacing measurements to detail #9 on A500 and or P401. -IPC 404.2, 405.3.1
6). Page 7 & 8 of the civil utility piping plans show different sewer sizes than shown on P100, the plan pages need to correlate & BLDG drain sewer connection can't reduce in direction of flow. _ IPC 704.2
7). Page 7 of the civil utility piping plan shows a 2" water service, but Plan pg. P400 shows a required 3" water main. Water service needs to be to be sized to match the requirements of the Building. IPC 604
8). plan page P401 Floor sinks in Mech room 010 need trap primers, due to equipment that these floor sinks service would only discharge in an emergency. -IPC 1002.4.1
9). Waste stack vents on P301 need to remain full size 3" thru the roof. -IPC 913.3
10). Waste stack risers on P301 have the levels mis-labeled within the box notes. Update Box notes -IPC A106.3.1
11). Add a sanitary/vent riser diagram to P301 or new page for the non-typical plumbing/drains originating from the main floor. -IPC A106.3.1
12). Add a roof plan showing the locations of the sanitary vents. A106.3.1
13). On plan Pg. P400 in Mech room 010 the Base of the 2" floor sink vent needs to be washed, the vent can't horizontally offset until 6" above the floor sink(s) being vented. -IPC 905.3, 905.4
14). All washers on the main floor level need to discharge thru a lint interceptor regardless of type. IPC 1003.6 ( due to multiple washers, will not meet the exception)
15). Plan page P501 detail # 9 doesn't illustrate Water Heater #4 please update. A106.3.1
16). Add beverage equipment backflows to P602. - IPC 608.17.1.1 thru 608.17.1.2
17). Revise plan page M105 to show the 4 gas water heater concentric vent termination locations. -IFGC A106.3.1
18). Add a gas vent riser diagram for the gas water heaters & furnace showing the vertical rise from from the 1st floor to the roof. -IFGC A106.3.1
19). Need to show the continuation of the gas line to the BBQ pavilion on P301 or P401. or provide the page number this continuation is located on. -IFGC A106.3.1
20). Gas water heater gas connection detail #9 on P501 needs to show the shut off valve before the sediment trap. -IFGC 408.4
21). BBQ's will need hood(s) if located under the pavilion roof or overhead construction -IFGC 623.5
10/05/2021 STEVE SHIELDS ZONING REVIEW Reqs Change ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
T21CM07491
My Place Extended Stay Hotel – 4710 S Calle Santa Cruz – PAD-29
New Splash Pad & Play Ground Equipment with Shade Structures.

TRANSMITTAL: October 5, 2021
Travelers Accommodations – Lodging is an allowed use in the PAD-21.

1. Zoning has reviewed the building plans for compliance with DP21-0193 and although the plans appear to match the DP Zoning cannot approve the building plans until the DP is approved.
10/05/2021 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed
10/13/2021 ROBERT SHERRY WATER REVIEW Reqs Change 1. Show the location of the proposed water meter, backflow preventer, and the water service pipe on a site plan. The development package is not a substitute for a complete site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018.
2. Reduced pressure backflow prevention assemblies are required to be installed in locations accessible to Tucson Water. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, http://www.tucsonaz.gov/files/water/docs/backflow-ordinance.pdf
10/18/2021 SBLOOD1 ENGINEERING REVIEW Reqs Change Engineering has reviewed the building plans for compliance with DP21-0193 and although the building plans appear to match the DP until the DP is approved Engineering cannot approve the building plans.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
10/18/2021 NGARCIA3 OUT TO CUSTOMER Completed