Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM07463
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/22/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
09/27/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
09/28/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | Provide an exhaust duct for the proposed clothes dryer. Reference: Section 504.8.6, IMC 2018. |
09/28/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Clarify how the drain plumbing for the new clothes washer relates to the existing building drain system on the plumbing plan. Reference: Section 107.2.1, IBC 2018. 2. The fixture drain serving an automatic clothes washer shall connect to a fixture branch or horizontal drain that is at least 3 inches in diameter. (The fixture drain cannot connect to the tailpiece of the mop sink.) Reference: Section 406.2, IPC 2018. 3. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves (e.g. clothes washer). Reference: Section 604.9, IPC 2018. |
09/28/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
10/06/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
10/06/2021 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
10/06/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/14/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Approved |