Permit Number: T21CM07460
Parcel: 12701004H

Review Status: Completed

Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG

Permit Number - T21CM07460
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/08/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
10/08/2021 STEVE SHIELDS ZONING REVIEW Approved
10/08/2021 JVINCEN1 FIRE REVIEW Approved
10/13/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the electrical review comments and provide a written response.

Ref; Plan Sheet PV 2.5. The 3 line diagram for buildings ‘B’ and ‘C’ are identified as Building ‘A’ below the diagram. Please clarify.

Ref; Plan Sheet PV 2.1, PV 2.3. Show panel ‘P4’ distance from the switchgear in the 3 line diagram for building ‘A’ along with the feeder conductor sizes and types.. Due to the distance of panel ‘P4’ from the existing service, and the location of the PV output interconnection, the tap rules of NEC art 240 may not apply. In that case, the feeder sizes for panel ‘P4’ may need to be increased as required per NEC art 705.12B(2). This requirement is because now there is a increase in the amount of current available or imposed on the feeder for panel ‘P4’. 400 amps + PV Output amps .. See NEC 240.4.

Verify and show evidence per the manufacture of panel ‘P4’ that installing a 400 amp main circuit breaker on a panel that was installed as a main lug only panel configuration will not compromise the listing or performance of the panel. NEC 110.3B.

Provide compliance with NEC 690.12, 690.56C for labeling and Rapid Shutdown Switch(s) where applicable for 3 PV systems.

Include the Power Shutdown Initiation devices local to the PV arrays in the 3 line diagrams. In compliance NEC 690.12.

Provide details for the grounding methods of the racking and Modules for the roof and Canopies.

Provide a permanent directory at each PV Disconnecting Means as required per NEC 690.4(D), 705.10.

Ref; 2018 IBC 107.2.1, 2017 NEC.
11/02/2021 LOREN MAKUS ENGINEERING REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
11/02/2021 VVERA1 OUT TO CUSTOMER Completed