Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Permit Number - T21CM07418
Review Name: COMMERCIAL - BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/16/2021 | JVINCEN1 | FIRE | REVIEW | Approved | |
| 09/23/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 09/29/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Show how the new water piping relates to the existing water supply system and show that the additional demand does not cause the existing piping to be overloaded. Reference: Section 107.2.1, IBC 2018. 2. The notes for the splash pad call for a maximum water pressure of 50 PSI at the distribution manifold but does not indicate the required minimum water pressure. Verify the minimum available water pressure for this address with Tucson Water; the data from Tucson Water appears to show a pressure range of 46 to 53 PSI. Revise the water pressure calculations as required. 3. Show how the drainage from the splash pad will be conveyed to the public sewer system. Reference: Section 107.2.1, IBC 2018. |
| 09/29/2021 | ROBERT SHERRY | WATER | REVIEW | Reqs Change | Show the location of the water meter, backflow preventer, and the water service pipe on a site plan. Provide the size of the water meter serving this site, the size of the backflow preventer associated with the water meter, and the proposed total water demand to be served by the water meter. Reference: Section 107.2.1 and 107.2.6, IBC 2018. |
| 10/04/2021 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
| 10/04/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 10/04/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: T21CM07418 1001 N Richey Bl. New Splash Pad & Play Ground Equipment with Shade Structures. TRANSMITTAL: October 4, 2021 This site is located in the R-3 & C-2 zone (UDC 4.7.12 & UDC 4.7.21). 1. As you are proposing changes to a commercial site a Develop Package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites found at: https://www.tucsonaz.gov/files/pdsd/forms/Minor_Changes_to_Commercial_Industrial_Sites_.pdf, must be submitted and approved prior to approval of this plan. The DP is a separate submittal from this plan and is submitted at: https://docs.tucsonaz.gov/Forms/tucsonpermitapp, using submission type “Site Review”. |
| 10/13/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the following electrical plan review comments and provide a written response. Provide plans sealed by an Electrical Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. Ref; 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/13/2021 | VVERA1 | OUT TO CUSTOMER | Completed |