Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T21CM07208
Parcel: 11005014C

Review Status: Completed

Review Details: COMMERCIAL - TI

Permit Number - T21CM07208
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/13/2021 JPEELDA1 FIRE REVIEW Approved
09/16/2021 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Reqs Change 1. Sheet A1.0; Sheet Index: Please complete the Sheet Index.
2. Sheet A2.0; Floor Plan: This plan indicates the addition of new partition walls in the tenant space adjacent to the space being permitted. New work in the adjacent suite would require a separate permit. Please remove from the Floor Plan all work in the adjacent suite.
3. Sheet A2.0; Demolition Keynotes: Keynotes 3, 4, and 5 were not located on the plan. Please verify.
4. Sheet A2.0; Wall Tag: For Partition Types C, D, and E, please indicate the gauge of the metal studs in the description.
5. General: Please provide written responses to all review comments.
09/16/2021 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Reqs Change The existing fan coil, FC-2, shows no indication that any outside air is being supplied to suite 216. Ventilation is required and must be provided whenever the space is occupied. Show how ventilation is supplied to the suite. Reference: Sections 401.2 and 401.3, IMC 2018.
09/16/2021 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed
09/16/2021 ROBERT SHERRY WATER REVIEW Completed
09/24/2021 STEVE SHIELDS ZONING REVIEW Approved
09/24/2021 SSHIELD1 ENGINEERING REVIEW Passed
09/24/2021 SSHIELD1 COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
10/05/2021 DAN SANTA CRUZ ELECTRICAL-COMMERCIAL REVIEW Reqs Change Please address the electrical comments and provide a written response. 1. Provide compliance wirh the 2018 IECC for the lighting. 2. Provide branch circuit information for the lighting and power. 3. Provide a complete panel schedule and location for the panel. 4. Clarify the Keyed Notes to correlate with the power plan
Ref; 2018 IBC 107.2.1, 2017 NEC art 408.4, City of Tucson Commercial Plan Submittal Requirements.