Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL - TI
Permit Number - T21CM07208
Review Name: COMMERCIAL - TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/13/2021 | JPEELDA1 | FIRE | REVIEW | Approved | |
09/16/2021 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. Sheet A1.0; Sheet Index: Please complete the Sheet Index. 2. Sheet A2.0; Floor Plan: This plan indicates the addition of new partition walls in the tenant space adjacent to the space being permitted. New work in the adjacent suite would require a separate permit. Please remove from the Floor Plan all work in the adjacent suite. 3. Sheet A2.0; Demolition Keynotes: Keynotes 3, 4, and 5 were not located on the plan. Please verify. 4. Sheet A2.0; Wall Tag: For Partition Types C, D, and E, please indicate the gauge of the metal studs in the description. 5. General: Please provide written responses to all review comments. |
09/16/2021 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Reqs Change | The existing fan coil, FC-2, shows no indication that any outside air is being supplied to suite 216. Ventilation is required and must be provided whenever the space is occupied. Show how ventilation is supplied to the suite. Reference: Sections 401.2 and 401.3, IMC 2018. |
09/16/2021 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
09/16/2021 | ROBERT SHERRY | WATER | REVIEW | Completed | |
09/24/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
09/24/2021 | SSHIELD1 | ENGINEERING | REVIEW | Passed | |
09/24/2021 | SSHIELD1 | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
10/05/2021 | DAN SANTA CRUZ | ELECTRICAL-COMMERCIAL | REVIEW | Reqs Change | Please address the electrical comments and provide a written response. 1. Provide compliance wirh the 2018 IECC for the lighting. 2. Provide branch circuit information for the lighting and power. 3. Provide a complete panel schedule and location for the panel. 4. Clarify the Keyed Notes to correlate with the power plan Ref; 2018 IBC 107.2.1, 2017 NEC art 408.4, City of Tucson Commercial Plan Submittal Requirements. |